27.04.2014 Views

Landcom Book 4 Maintenance - WSUD

Landcom Book 4 Maintenance - WSUD

Landcom Book 4 Maintenance - WSUD

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Water Sensitive Urban Design<br />

Finished levels<br />

As constructed survey of basin surface and<br />

surrounding bunds completed<br />

Final constructed levels are consistent with<br />

design levels<br />

Under-drainage pipes flushed to remove initial<br />

ingress of material<br />

All civil construction items are complete and basin is<br />

ready for planting by landscape contractor<br />

Geofabric layer + 50mm topsoil (top layer of<br />

supplied filter material) and turf applied to basin<br />

surface.<br />

Suitable batter protection in place<br />

(e.g. sediment fence or landscape netting)<br />

HOLD POINT - Sign off is required from superintendent and bioretention basin designer before proceeding<br />

Comments<br />

Signed by Superintendent(s):<br />

Print Name:<br />

Date:<br />

56 <strong>Book</strong> 4 | MAINTENANCE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!