- Page 1: south-east regional authority údar
- Page 5 and 6: FOREWORD Energy policy has become i
- Page 7 and 8: Regional targets have been set for
- Page 9 and 10: Transport Sector Green Biofuels Ire
- Page 11 and 12: Heat Sector Targets Key Actions Pub
- Page 13 and 14: 3.4.3. Refit 21 3.4.4. CHP Deployme
- Page 15 and 16: 11. Statutory Requirements For Bioe
- Page 17 and 18: ENERGY CONVERSION FACTORS TO toe MW
- Page 19 and 20: LFG LPG MJ MOT MOTR MSW Mt MW MWh N
- Page 21 and 22: 1. INTRODUCTION Energy security and
- Page 23 and 24: 1.1. Bioenergy Bioenergy is the gen
- Page 25 and 26: Chapter 5 contains the current esti
- Page 27 and 28: SERA, since its establishment, has
- Page 29 and 30: the negotiation of energy supply co
- Page 31 and 32: The current programme aims to: •
- Page 33 and 34: Figure 3.1: Summary of Bioenergy Po
- Page 35 and 36: The Directive aims to promote the u
- Page 37 and 38: The main provisions of the Bioenerg
- Page 39 and 40: By mid-2007 almost 14,000 applicati
- Page 41 and 42: On 23rd November 2006 the DCENR ann
- Page 43 and 44: 4. METHODOLOGY FOR THE DEVELOPMENT
- Page 45 and 46: 5. CURRENT ENERGY BALANCE An estima
- Page 47 and 48: Table 5.3 outlines the current esti
- Page 49 and 50: The figures for 2006 had been relea
- Page 51 and 52: 5.7. The Agricultural Sector The to
- Page 53 and 54:
Sugar Beet and Cereals Sugar beet a
- Page 55 and 56:
Table 6.2 shows the current planted
- Page 57 and 58:
of energy. The first round of appli
- Page 59 and 60:
The South-East Waste Management Reg
- Page 61 and 62:
6.8.3. Potential to Increase Willow
- Page 63 and 64:
7.1.2. Wood Pellets Figure 7.2: Flo
- Page 65 and 66:
of the cereal and the latter can be
- Page 67 and 68:
7.4.1. Co-product from Biogas Produ
- Page 69 and 70:
8.1.2. Medium-Scale Heating Boilers
- Page 71 and 72:
Figure 8.2: Combined Heat and Power
- Page 73 and 74:
The different application and distr
- Page 75 and 76:
8.4. Petrol Vehicles Bioethanol can
- Page 77 and 78:
9. VIABILITY ANALYSES OF BIOENERGY
- Page 79 and 80:
In the transport sector the use of
- Page 81 and 82:
Private companies normally require
- Page 83 and 84:
The conclusions from the viability
- Page 85 and 86:
The investment costs for a wood chi
- Page 87 and 88:
9.5. Qualitative Assessments of oth
- Page 89 and 90:
9.6. Summary of the Bioenergy Poten
- Page 91 and 92:
10. BARRIER ASSESSMENT Despite a la
- Page 93 and 94:
another. The successful implementat
- Page 95 and 96:
11. STATUTORY REQUIREMENTS FOR BIOE
- Page 97 and 98:
(c) a description of the likely sig
- Page 99 and 100:
The key objective of this Regulatio
- Page 101 and 102:
12. BIOENERGY IMPLEMENTATION PLAN F
- Page 103 and 104:
These targets were suggested, based
- Page 105 and 106:
12.3.1. Achieving the 2010 Sectoral
- Page 107 and 108:
Table 12.8: Sectoral Targets for 20
- Page 109 and 110:
6. Successful achievement of Region
- Page 111 and 112:
3. Promote Awareness of the Potenti
- Page 113 and 114:
5. Electricity Sector: To increase
- Page 116 and 117:
Appendices south-east regional auth
- Page 118 and 119:
SEI Approved Installers in the Sout
- Page 120 and 121:
SEI Approved Installers in the Sout
- Page 122 and 123:
SEI Approved Installers in the Sout
- Page 124 and 125:
SEI Approved Installers in the Sout
- Page 126 and 127:
Project: Technology: Project Summar
- Page 128 and 129:
Project: Technology: Project Summar
- Page 130 and 131:
Assumptions Regarding Fuel The fuel
- Page 132 and 133:
For the analysis of wood fuel based
- Page 134 and 135:
Kilkenny County Council Waterford C
- Page 136 and 137:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
- Page 138:
SOUTH-EAST REGIONAL AUTHORITY, ÚDA