Transport Sector<br />

Green Biofuels Ireland Ltd. is currently constructing a biodiesel plant in New Ross, Co. Wexford and intends to commence<br />

production by the end of 2008. This plant will aim to produce 32 million litres of biofuels which is equivalent to 1050 TJ<br />

of energy from biomass. Assuming that approx 50% of this biodiesel will be consumed within the Region, this equates<br />

to 525 TJ of transport energy from biofuels.<br />

In addition, two pure plant oil (PPO) producing companies based in the <strong>South</strong>-<strong>East</strong> – Biogreen Energy Products Ltd. and<br />

Goldstar Oils Ltd. – have been awarded Mineral Oil Tax Relief (MOTR) and will produce 14 million litres of PPO by the<br />

end of 2010. This is equal to 480 TJ of energy from biofuels and if the assumption is made that half of this PPO will be<br />

consumed within the Region, this equates to 240 TJ of transport energy from biomass.<br />

The successful achievement of these regional targets would provide an estimated saving of regional CO2 emissions of<br />

0.21 million tonnes of CO2 by 2010.<br />

<strong>Regional</strong> Targets 2020<br />

<strong>Bioenergy</strong> to supply 17% of <strong>Regional</strong> TFC by 2020<br />

Heat Electricity Transport<br />

8,003 TJ<br />

1,296 TJ<br />

1,708 TJ<br />

~ 30%<br />

~ 14%<br />

~ 10%<br />

of demand 2 of demand 2 of demand 2<br />

2 It is assumed that energy consumption in 2020 will increase by 10% on 2006 figures<br />

Achieving the 2020 <strong>Regional</strong> Targets<br />

Heat Sector<br />

In order to achieve the target to increase the production of heat from bioenergy in the Region by 2020, the installation<br />

of further biomass heating systems will be required across the <strong>South</strong>-<strong>East</strong>:<br />

Domestic<br />

The installation of at least 10,000 biomass boilers with a capacity of 20 kW each over the period from 2010 to 2020 will<br />

provide a bioenergy heat supply of 1,620 TJ per annum. This will increase the regional demand for wood pellets.<br />