07.09.2014 Views

Samriddhi

Samriddhi

Samriddhi

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Samriddhi</strong> Project Document Phase 1<br />

Annexes<br />

• Analyse the data through using appropriate software<br />

• Present the major findings of the study to the project people<br />

• Prepare the final report through incorporating comments and feedbacks from the project<br />

people.<br />

Qualification:<br />

• Practical experience of doing similar type of study<br />

• Professionals having solid understanding on institutional aspects<br />

• Competent staff members having solid analytical capacities<br />

• Track record and reputation to produce quality outputs in similar study.<br />

CONS-04b Assessment of project’s effects on indirect beneficiary households<br />

(To be determined)<br />

• Design an appropriate methodology for the assessment in consultation with <strong>Samriddhi</strong><br />

personnel<br />

• Select the assessment sites and participants to be surveyed through using a well<br />

accepted sampling methodology<br />

• Develop the questionnaire, checklists and other tools to collect data from the<br />

stakeholders of the project<br />

• Field trial of methodology, questionnaire, checklists and other tools, and make<br />

necessary adjustment<br />

• Organise survey and collect data from all stakeholders through using the agreed upon<br />

tools/methods<br />

• Analyse the data through using appropriate software<br />

• Present the major findings of the assessment to the project people<br />

• Prepare the final report through incorporating comments and feedbacks from the project<br />

people.<br />

Qualification:<br />

• Practical experience of doing similar type of assessment<br />

• Professionals having solid understanding on institutional aspects<br />

• Competent staff members having solid analytical capacities<br />

• Track record and reputation to produce quality outputs in similar study.<br />

CONS-04c Interim staff replacements (e.g. due to maternity leave)<br />

(To be determined)<br />

• Review relevant documents to understand and learn the vision, goal, objectives,<br />

approaches, strategies and practices of <strong>Samriddhi</strong> project<br />

Intercooperation Bangladesh<br />

Page XCIX

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!