Samriddhi
Samriddhi
Samriddhi
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Samriddhi</strong> Project Document Phase 1<br />
Annexes<br />
• Analyse the data through using appropriate software<br />
• Present the major findings of the study to the project people<br />
• Prepare the final report through incorporating comments and feedbacks from the project<br />
people.<br />
Qualification:<br />
• Practical experience of doing similar type of study<br />
• Professionals having solid understanding on institutional aspects<br />
• Competent staff members having solid analytical capacities<br />
• Track record and reputation to produce quality outputs in similar study.<br />
CONS-04b Assessment of project’s effects on indirect beneficiary households<br />
(To be determined)<br />
• Design an appropriate methodology for the assessment in consultation with <strong>Samriddhi</strong><br />
personnel<br />
• Select the assessment sites and participants to be surveyed through using a well<br />
accepted sampling methodology<br />
• Develop the questionnaire, checklists and other tools to collect data from the<br />
stakeholders of the project<br />
• Field trial of methodology, questionnaire, checklists and other tools, and make<br />
necessary adjustment<br />
• Organise survey and collect data from all stakeholders through using the agreed upon<br />
tools/methods<br />
• Analyse the data through using appropriate software<br />
• Present the major findings of the assessment to the project people<br />
• Prepare the final report through incorporating comments and feedbacks from the project<br />
people.<br />
Qualification:<br />
• Practical experience of doing similar type of assessment<br />
• Professionals having solid understanding on institutional aspects<br />
• Competent staff members having solid analytical capacities<br />
• Track record and reputation to produce quality outputs in similar study.<br />
CONS-04c Interim staff replacements (e.g. due to maternity leave)<br />
(To be determined)<br />
• Review relevant documents to understand and learn the vision, goal, objectives,<br />
approaches, strategies and practices of <strong>Samriddhi</strong> project<br />
Intercooperation Bangladesh<br />
Page XCIX