29.09.2014 Views

Equipment for Rational Securing of Cargo on Railway ... - Vinnova

Equipment for Rational Securing of Cargo on Railway ... - Vinnova

Equipment for Rational Securing of Cargo on Railway ... - Vinnova

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MariTerm AB 2004-01-30 jvgRASLA<br />

Not c<strong>on</strong>sidered in these analysis.<br />

Cost <str<strong>on</strong>g>for</str<strong>on</strong>g> <str<strong>on</strong>g>Cargo</str<strong>on</strong>g> Transport Unit (CTU) and vehicles - CLCV<br />

Not c<strong>on</strong>sidered in these analysis.<br />

Capital cost <str<strong>on</strong>g>of</str<strong>on</strong>g> the cargo during handling and transport - CLTH<br />

Not c<strong>on</strong>sidered in these analysis<br />

Cost <str<strong>on</strong>g>for</str<strong>on</strong>g> cargo securing training - CLTS<br />

Not c<strong>on</strong>sidered in these analysis<br />

10.1.2 <str<strong>on</strong>g>Cargo</str<strong>on</strong>g> Transport Unit (CTU)<br />

The valid type <str<strong>on</strong>g>of</str<strong>on</strong>g> railway wag<strong>on</strong> can be found in the UIC-guidelines referred <str<strong>on</strong>g>for</str<strong>on</strong>g> the different<br />

type <str<strong>on</strong>g>of</str<strong>on</strong>g> load cases. In all load case the plat<str<strong>on</strong>g>for</str<strong>on</strong>g>m is made <str<strong>on</strong>g>of</str<strong>on</strong>g> wood.<br />

If not anything else is menti<strong>on</strong>ed the CTU <strong>on</strong> road is a semi-trailer <str<strong>on</strong>g>of</str<strong>on</strong>g> cover/stake type with<br />

plat<str<strong>on</strong>g>for</str<strong>on</strong>g>m made <str<strong>on</strong>g>of</str<strong>on</strong>g> wood or plyfa.<br />

10.1.3 Coefficient <str<strong>on</strong>g>of</str<strong>on</strong>g> fricti<strong>on</strong><br />

The coefficient <str<strong>on</strong>g>of</str<strong>on</strong>g> fricti<strong>on</strong> is set to the minimum value µ=0.3 <str<strong>on</strong>g>for</str<strong>on</strong>g> railway transport.<br />

In the cargo securing arrangements designed <str<strong>on</strong>g>for</str<strong>on</strong>g> road transport the coefficient <str<strong>on</strong>g>of</str<strong>on</strong>g> fricti<strong>on</strong> value<br />

is taken from the fricti<strong>on</strong> value table in VVFS 1998:95 secti<strong>on</strong> 5.0.4 or from referred<br />

instructi<strong>on</strong>s where the fricti<strong>on</strong> has been stated by inclining test. In some load cases the<br />

minimum value <str<strong>on</strong>g>for</str<strong>on</strong>g> road transport µ=0.2 is used.<br />

10.1.4 Time c<strong>on</strong>sumpti<strong>on</strong> – lashings<br />

The time c<strong>on</strong>sumpti<strong>on</strong> to per<str<strong>on</strong>g>for</str<strong>on</strong>g>m the different alternatives <str<strong>on</strong>g>of</str<strong>on</strong>g> lashing is estimated to the<br />

following values:<br />

− Scotches or wooden bars 2 min/scotch or bar<br />

− Nails 0.5 min/nail<br />

− Top-over lashing 5 min/lashing<br />

− Loop lashing 10 min/lashing<br />

− Spring lashing 10 min/lashing<br />

− Straight/cross lashing 5 min/lashing<br />

− Round-turn lashing 10 min/lashing<br />

− H-brace (pre-manufactured) 5 min/H-brace<br />

− Blocking with empty pallets 1 min/pallet<br />

The time value includes securing and un-securing the different alternative methods.<br />

190

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!