MariTerm AB 2004-01-30 jvgRASLA<br />

10.2.1 <strong>Railway</strong><br />

The securing arrangement <str<strong>on</strong>g>for</str<strong>on</strong>g> railway transport <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

coiled sheet is described in secti<strong>on</strong> 5.5. The securing<br />

arrangement c<strong>on</strong>sist <str<strong>on</strong>g>of</str<strong>on</strong>g> two pitched scotches <strong>on</strong> each<br />

side in lengthways directi<strong>on</strong> nailed with 5 ⏐ 2 nails<br />

each. Across the wag<strong>on</strong> <strong>on</strong>e wooden bar <strong>on</strong> each side<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> the coil is nailed with 3 nails each.<br />

Side view<br />

10.2.2 Road<br />

According to the Swedish Road Administrati<strong>on</strong><br />

regulati<strong>on</strong>s TSVFS 1978:10 § 4.1 the securing<br />

arrangement <str<strong>on</strong>g>for</str<strong>on</strong>g> road transport <str<strong>on</strong>g>of</str<strong>on</strong>g> coiled sheet is like<br />

the arrangement <str<strong>on</strong>g>for</str<strong>on</strong>g> railway with additi<strong>on</strong>al lashing. A<br />

sufficient way to secure the coil is with two spring<br />

lashes. One in each lengthways directi<strong>on</strong>.<br />

The securing arrangement c<strong>on</strong>sist also <str<strong>on</strong>g>of</str<strong>on</strong>g> two pitched<br />

scotches <strong>on</strong> each side in lengthways directi<strong>on</strong> nailed<br />

with 2 nails each. Across the vehicle <strong>on</strong>e wooden bar<br />

<strong>on</strong> each side <str<strong>on</strong>g>of</str<strong>on</strong>g> the coil is nailed with 3 nails each.<br />

Side view<br />

10.2.3 Input to the LSC-model<br />

The securing arrangements above gives the following input to the LSC –model:<br />

Input<br />

<strong>Railway</strong> –<br />

hump and fly<br />

shunting<br />

<strong>Railway</strong> -<br />

n<strong>on</strong> hump and<br />

fly shunting<br />

Road<br />

Time c<strong>on</strong>sumpti<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> no. <str<strong>on</strong>g>of</str<strong>on</strong>g>:<br />

- Scotches/wooden bars 6 6 6<br />

- Nails 26 14 14<br />

- Spring lashings 2<br />

Time c<strong>on</strong>sumpti<strong>on</strong> [min] 25 19 39<br />

No. <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong>e way equipment<br />

- Scotches 4 4 4<br />

- Wooden bar [m] 2 2 2<br />

- Nails 26 14 14<br />

- Edge protecti<strong>on</strong> [m] 0.5<br />

No. <str<strong>on</strong>g>of</str<strong>on</strong>g> returnable equipment<br />

- Web lashing with ratchet 2<br />

192