Equipment for Rational Securing of Cargo on Railway ... - Vinnova
Equipment for Rational Securing of Cargo on Railway ... - Vinnova
Equipment for Rational Securing of Cargo on Railway ... - Vinnova
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
MariTerm AB 2004-01-30 jvgRASLA<br />
Input <strong>Railway</strong> Road<br />
Time-c<strong>on</strong>sumpti<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> no. <str<strong>on</strong>g>of</str<strong>on</strong>g>:<br />
- Spring lashings 7<br />
- Loop lashings 4<br />
Time c<strong>on</strong>sumpti<strong>on</strong> [min] 0 110<br />
No. <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong>e way equipment<br />
- Edge protecti<strong>on</strong> [m] 2<br />
- Empty pallets 6<br />
No. <str<strong>on</strong>g>of</str<strong>on</strong>g> returnable equipment<br />
- Web lashing with ratchet 18<br />
10.8.4 Result<br />
The calculated cost in the LSC-model <str<strong>on</strong>g>for</str<strong>on</strong>g> the cargo securing arrangements above <str<strong>on</strong>g>for</str<strong>on</strong>g> two<br />
cargo secti<strong>on</strong>s with oiled steel tubes with a total cargo weight <str<strong>on</strong>g>of</str<strong>on</strong>g> 18 t<strong>on</strong> is:<br />
Mode <str<strong>on</strong>g>of</str<strong>on</strong>g> transport<br />
<str<strong>on</strong>g>Cargo</str<strong>on</strong>g> securing cost<br />
[SEK /CTU]<br />
<strong>Railway</strong> 0<br />
Road 627<br />
10.9 Summary<br />
The cost <str<strong>on</strong>g>for</str<strong>on</strong>g> cargo securing is almost in all cases lower <str<strong>on</strong>g>for</str<strong>on</strong>g> railway transport. The main<br />
reas<strong>on</strong>s are<br />
− In several cases <str<strong>on</strong>g>for</str<strong>on</strong>g> railway transport the cargo is allowed to slide lengthways. This is<br />
not an opti<strong>on</strong> in road transports and the securing arrangement will be extensive, if the<br />
load is not blocked <str<strong>on</strong>g>for</str<strong>on</strong>g>ward.<br />
− The UIC guidelines <str<strong>on</strong>g>for</str<strong>on</strong>g> cargo securing are designed <str<strong>on</strong>g>for</str<strong>on</strong>g> lower dimensi<strong>on</strong>ing <str<strong>on</strong>g>for</str<strong>on</strong>g>ces than<br />
road transport, see chapter 5.<br />
− The different types <str<strong>on</strong>g>of</str<strong>on</strong>g> goods in the load cases are suitable <str<strong>on</strong>g>for</str<strong>on</strong>g> railway transports as they<br />
are taken from the UIC-guidelines.<br />
The comparis<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> cost <str<strong>on</strong>g>for</str<strong>on</strong>g> cargo securing between railway and road transport are<br />
summarized in the table below:<br />
202