06.10.2014 Views

PDF | 8 MB - Australian Building Codes Board

PDF | 8 MB - Australian Building Codes Board

PDF | 8 MB - Australian Building Codes Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Australian</strong> <strong>Building</strong> <strong>Codes</strong> <strong>Board</strong> Page 17<br />

(b)<br />

The purpose of BCA 2013 is to—<br />

(i)<br />

(ii)<br />

update references to other documents; and<br />

include new provisions for openable windows to reduce falls in buildings; and<br />

(iii) include a Performance Requirement and reference a Standard for<br />

construction in flood hazard areas; and<br />

(iv)<br />

(v)<br />

(vi)<br />

consolidate the building related components of the AS 1735 lift series into<br />

the BCA; and<br />

enhance the egress provisions for people with disability; and<br />

include minor technical changes.<br />

12.0 Adoption of BCA 2014<br />

(a)<br />

The 2014 edition of the BCA was adopted by the Commonwealth, States and<br />

Territories as set out in Table 12.0.<br />

Table 12.0 History of adoption of BCA 2014<br />

Administration<br />

Adoption Date<br />

<strong>Australian</strong> Government 1 May 2014<br />

<strong>Australian</strong> Capital Territory 1 May 2014<br />

New South Wales 1 May 2014<br />

Northern Territory 1 May 2014<br />

Queensland 1 May 2014<br />

South Australia 1 May 2014<br />

Tasmania 1 May 2014<br />

Victoria 1 May 2014<br />

Western Australia 1 May 2014<br />

(b)<br />

The purpose of BCA 2014 is to—<br />

(i)<br />

update references to other documents; and<br />

(ii) include provisions to limit the intrusion of external noise into Class 2<br />

buildings; and<br />

(iii)<br />

(iv)<br />

(v)<br />

(vi)<br />

(vii)<br />

(viii)<br />

quantify slip resistance on ramps, stairways and landings; and<br />

include provisions for photoluminescent exit signs; and<br />

PUBLIC COMMENT DRAFT<br />

quantify the amount of overflow that must be accommodated by an eaves<br />

gutter system; and<br />

expand the fire-resistance concession for timber framed construction to<br />

include Class 3 buildings; and<br />

remove the requirement for fire hose reels in a Class 2 or Class 3 building or<br />

a Class 4 part of a building; and<br />

include minor technical changes.<br />

NCC2014 Volume One 12.0

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!