Days<br />
1 2 3 4 5 6 7 8 9 101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960<br />
45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />
SC processing and fueling in PPF<br />
10<br />
13<br />
5<br />
Mate PLU to LV and test (figs. 7.3.2-3 and 7.3.2-4 in FAH)<br />
3 Transfer to LP and test (figs. 7.3.2-5 and 7.3.2-6 in FAH and fig. A-1 attached)<br />
12<br />
LP and ACS transit to launch site #<br />
3 <strong>Launch</strong> ops $<br />
SC mate to SCA<br />
SC mate to ISPS<br />
Install diaphragm and final assembly<br />
Integrated SC/ISPS health checks (figs. 7.3.2-1 and 7.3.2-2 in FAH)<br />
Final ISPS/PLF closeouts and assemblies<br />
Rotate SC and encapsulation<br />
RF checks (fig. 7.3.3-1 in FAH)<br />
<strong>Sea</strong>t PLF and install bolts*<br />
PLU load transfer to EPTME<br />
Final PLF/ISPS assembly and closeouts<br />
PLU transfer preps<br />
ACS preps to sail<br />
ACS transit to HP<br />
LP preps to sail<br />
LP transit to HP<br />
7<br />
Remove EGSE<br />
12<br />
Remove SC EGSE<br />
SC/PLU combined ops<br />
13 work days<br />
Legend:<br />
SC power and communication ON is at the discretion of the customer.<br />
Outage days — potential for second-shift customer work available with coordination.<br />
Partial outage day — blocks of 2 to 4 hr unavailable, the remainder available with coordination.<br />
SC power and communication ON can occur for 2-4 hr a day with 24-hr notice and coordination at daily coordination meetings<br />
(predefined or prearranged outages include sun outages, scintillations, and equipment maintenance.<br />
SC will be powered on as a part of Boeing tests.<br />
SC power and communication ON and battery charge plan required for final countdown.<br />
FAH is Facility Accommodations Handbook (<strong>Sea</strong> <strong>Launch</strong> Facilities Handbook for Customer).<br />
* = Day 28 = Part of the day is combined Boeing/customer RF checks, and the rest of the day is unavailable.<br />
# = Figure 7.3.2-5 in FAH, and figure A-1 attached.<br />
$ = Figures 7.3.2-5 and 7.3.2-6 in FAH, and figure A-1 attached.<br />
Figure 8-3. Campaign Timeline<br />
265807J3-143<br />
REV B D688-10009-1 8-3