Days<br />

1 2 3 4 5 6 7 8 9 101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960<br />

45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

SC processing and fueling in PPF<br />

10<br />

13<br />

5<br />

Mate PLU to LV and test (figs. 7.3.2-3 and 7.3.2-4 in FAH)<br />

3 Transfer to LP and test (figs. 7.3.2-5 and 7.3.2-6 in FAH and fig. A-1 attached)<br />

12<br />

LP and ACS transit to launch site #<br />

3 <strong>Launch</strong> ops $<br />

SC mate to SCA<br />

SC mate to ISPS<br />

Install diaphragm and final assembly<br />

Integrated SC/ISPS health checks (figs. 7.3.2-1 and 7.3.2-2 in FAH)<br />

Final ISPS/PLF closeouts and assemblies<br />

Rotate SC and encapsulation<br />

RF checks (fig. 7.3.3-1 in FAH)<br />

<strong>Sea</strong>t PLF and install bolts*<br />

PLU load transfer to EPTME<br />

Final PLF/ISPS assembly and closeouts<br />

PLU transfer preps<br />

ACS preps to sail<br />

ACS transit to HP<br />

LP preps to sail<br />

LP transit to HP<br />

7<br />

Remove EGSE<br />

12<br />

Remove SC EGSE<br />

SC/PLU combined ops<br />

13 work days<br />

Legend:<br />

SC power and communication ON is at the discretion of the customer.<br />

Outage days — potential for second-shift customer work available with coordination.<br />

Partial outage day — blocks of 2 to 4 hr unavailable, the remainder available with coordination.<br />

SC power and communication ON can occur for 2-4 hr a day with 24-hr notice and coordination at daily coordination meetings<br />

(predefined or prearranged outages include sun outages, scintillations, and equipment maintenance.<br />

SC will be powered on as a part of Boeing tests.<br />

SC power and communication ON and battery charge plan required for final countdown.<br />

FAH is Facility Accommodations Handbook (<strong>Sea</strong> <strong>Launch</strong> Facilities Handbook for Customer).<br />

* = Day 28 = Part of the day is combined Boeing/customer RF checks, and the rest of the day is unavailable.<br />

# = Figure 7.3.2-5 in FAH, and figure A-1 attached.<br />

$ = Figures 7.3.2-5 and 7.3.2-6 in FAH, and figure A-1 attached.<br />

Figure 8-3. Campaign Timeline<br />

265807J3-143<br />

REV B D688-10009-1 8-3