Mission integration<br />

schedule<br />

The mission integration schedule and detailed schedule will be developed<br />

after a contract is established or a launch option is exercised and the<br />

spacecraft is committed on the <strong>Sea</strong> <strong>Launch</strong> manifest.<br />

The integration schedule is produced by the mission manager and agreed<br />

to by the customer. This schedule includes<br />

• Spacecraft integration milestones.<br />

• Data deliverables (spacecraft models and analysis reports).<br />

• Reviews.<br />

• Integration activities.<br />

The detailed schedule for the launch campaign will be produced by the<br />

payload integration manager. This schedule defines<br />

• General operations flow.<br />

• Schedule of customer reviews.<br />

• Overall training and rehearsal requirements.<br />

• Integrated schedules for processing and launch operations.<br />

• Hardware need dates.<br />

• Spacecraft integration milestones.<br />

• Key Home Port, assembly and command ship, and launch platform<br />

events.<br />

Analysis plan<br />

The analysis plan defines<br />

• Each of the specialty areas where analyses are performed.<br />

• Inputs required from the customer.<br />

• Tasks to be accomplished.<br />

• Specific products to be provided to the customer.<br />

The plan covers analyses in the areas of<br />

• Thermal. • Shock and vibration.<br />

• Acoustic. • EMI and EMC.<br />

• Radio frequency links. • Orbit and trajectory details.<br />

• Contamination. • Separation clearances.<br />

• Loads.<br />

REV B D688-10009-1 4-9