Ground processing<br />

and transportation–second<br />

phase<br />

Following encapsulation in the PLF, the spacecraft environment is maintained<br />

with a continuous, conditioned air supply. Air is ducted to the PLF<br />

thermal conditioning inlet diffuser (fig. 5-15), and exits to the DM-SL<br />

cavity through vent valves on the payload structure.<br />

Air conditioning units on the spacecraft transporter, ACS, and LP are<br />

dedicated to maintaining spacecraft environments within the PLF during<br />

processing and handling at Home Port, in the ACS, and while in transit to<br />

the launch site. The LP integrated launch vehicle (ILV) air conditioning<br />

system satisfies conditioned air requirements of the PLU, Block DM-SL,<br />

and boost vehicle on the launch pad during prelaunch phases. The flow<br />

from the LP ILV air conditioning system is terminated at approximately<br />

L-17 min (on retraction of the transporter/erector and separation of the<br />

LV umbilicals). Conditioned airflow to the PLF is maintained through<br />

the remainder of the countdown (and through an abort recycle operation)<br />

by way of the LP high-pressure PLF purge system.<br />

PLU environmental control system inlet conditions and control capabilities<br />

are summarized in table 5-6. All air conditioning systems maintain<br />

positive pressure inside the PLF to prevent air-transported contaminants<br />

from entering the PLF. Air quality is maintained by providing purge air<br />

that has been high efficiency particulate air (HEPA) filtered to class-<br />

5,000 maximum per FED-STD-209E.<br />

PLF volume<br />

PLF<br />

flight vents<br />

Payload structure<br />

PLS vents<br />

(one-way valves)<br />

Block<br />

DM-SL<br />

Block DM flight vents<br />

Block DM-SL vents<br />

IC vent<br />

Spacecraft<br />

Sidewall<br />

diffuser<br />

PLU thermostating<br />

inlet (up to 5100 m 3 /hr)<br />

Block DM<br />

thermostating inlet<br />

(5100 m 3 /hr)<br />

IC<br />

thermostating<br />

inlet<br />

(2000 m 3 /hr)<br />

Zenit-2SL IC<br />

IC membrane vents<br />

Note: Drawing not to scale.<br />

265807J3-010R4<br />

Figure 5-15. Payload Unit Air Conditioning Venting Scheme<br />