Ground processing<br />
and transportation–second<br />
phase<br />
Following encapsulation in the PLF, the spacecraft environment is maintained<br />
with a continuous, conditioned air supply. Air is ducted to the PLF<br />
thermal conditioning inlet diffuser (fig. 5-15), and exits to the DM-SL<br />
cavity through vent valves on the payload structure.<br />
Air conditioning units on the spacecraft transporter, ACS, and LP are<br />
dedicated to maintaining spacecraft environments within the PLF during<br />
processing and handling at Home Port, in the ACS, and while in transit to<br />
the launch site. The LP integrated launch vehicle (ILV) air conditioning<br />
system satisfies conditioned air requirements of the PLU, Block DM-SL,<br />
and boost vehicle on the launch pad during prelaunch phases. The flow<br />
from the LP ILV air conditioning system is terminated at approximately<br />
L-17 min (on retraction of the transporter/erector and separation of the<br />
LV umbilicals). Conditioned airflow to the PLF is maintained through<br />
the remainder of the countdown (and through an abort recycle operation)<br />
by way of the LP high-pressure PLF purge system.<br />
PLU environmental control system inlet conditions and control capabilities<br />
are summarized in table 5-6. All air conditioning systems maintain<br />
positive pressure inside the PLF to prevent air-transported contaminants<br />
from entering the PLF. Air quality is maintained by providing purge air<br />
that has been high efficiency particulate air (HEPA) filtered to class-<br />
5,000 maximum per FED-STD-209E.<br />
PLF volume<br />
PLF<br />
flight vents<br />
Payload structure<br />
PLS vents<br />
(one-way valves)<br />
Block<br />
DM-SL<br />
Block DM flight vents<br />
Block DM-SL vents<br />
IC vent<br />
Spacecraft<br />
Sidewall<br />
diffuser<br />
PLU thermostating<br />
inlet (up to 5100 m 3 /hr)<br />
Block DM<br />
thermostating inlet<br />
(5100 m 3 /hr)<br />
IC<br />
thermostating<br />
inlet<br />
(2000 m 3 /hr)<br />
Zenit-2SL IC<br />
IC membrane vents<br />
Note: Drawing not to scale.<br />
265807J3-010R4<br />
Figure 5-15. Payload Unit Air Conditioning Venting Scheme<br />
5-18 D688-10009-1 REV B