8.2 Phase II⎯Mating to the LV and Integrated Testing on the ACS<br />

Zenit processing<br />

prior to spacecraft<br />

mating<br />

Zenit-3SL launch vehicle processing is performed on the ACS while the<br />

spacecraft is still in the payload processing facility (see fig. 8-15). At the<br />

pier, complete systems for loading fuels, compressed gasses, and<br />

cryogens are provided.<br />

The Zenit first and second stages are fully tested, the Block DM-SL is<br />

tested and fueled, and the Block DM-SL upper stage is mated onto the<br />

Zenit-3SL rocket. After mating and integrated testing, the launch vehicle<br />

is now ready to receive the payload unit, which includes the encapsulated<br />

spacecraft (see fig. 8-16).<br />

265807J3-107<br />

Figure 8-15. Zenit-3SL <strong>Launch</strong> Vehicles in the Assembly and Command Ship<br />

REV B D688-10009-1 8-13