25.10.2014 Views

Sea Launch User's Guide

Sea Launch User's Guide

Sea Launch User's Guide

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Integration documentation<br />

At the beginning of the integration process, the customer will receive the<br />

generic documentation used for spacecraft integration on all <strong>Sea</strong> <strong>Launch</strong><br />

missions. These documents allow the customer to understand the generic<br />

integration process. This documentation includes<br />

• Mission integration schedule.<br />

• Analysis plan.<br />

• Contamination control plan.<br />

• Electromagnetic interference and control plan.<br />

These generic documents provide the basis for the mission-specific interface<br />

control document:<br />

• Generic spacecraft to <strong>Sea</strong> <strong>Launch</strong> system interface control document<br />

(ICD).<br />

• Spacecraft interface control document verification plan.<br />

The interface control document allows the customer to define unique interfaces<br />

between its spacecraft and the <strong>Sea</strong> <strong>Launch</strong> system.<br />

Operations documentation<br />

The generic operations documentation available to the customer for understanding<br />

the operations details consists of<br />

• <strong>Sea</strong> <strong>Launch</strong> operations plan.<br />

• <strong>Sea</strong> <strong>Launch</strong> safety regulations manual.<br />

• Training, certification, and rehearsal plan.<br />

REV B D688-10009-1 4-7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!