25.10.2014 Views

Sea Launch User's Guide

Sea Launch User's Guide

Sea Launch User's Guide

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Encapsulation cell<br />

The encapsulation cell is an environmentally controlled cleanroom used<br />

for the preparation of the payload fairing and the interface skirt and payload<br />

structure. This cell contains all the equipment necessary to mate the<br />

spacecraft to the adapter, and encapsulate that assembly within the payload<br />

fairing.<br />

Lobby<br />

The lobby of the PPF is available for viewing the activities within the<br />

encapsulation cell. A break room is connected to the lobby.<br />

Ordnance facility<br />

An ordnance storage building (building 2) is located near the PPF at the<br />

Home Port. This building is used to store the packaged explosive items<br />

for use by the launch vehicle and its payload.<br />

Customer warehouse/storage<br />

facilities<br />

Building 10 (fig. 9-1) is available to the customer for storing supplies,<br />

shipping containers, and other miscellaneous equipment. Storage areas<br />

can be secured with access controlled by the customer. With prior coordination,<br />

additional customer storage may be arranged.<br />

The pier<br />

The pier (fig. 9-1) provides facilities for mooring, servicing, and supplying<br />

the <strong>Sea</strong> <strong>Launch</strong> vessels. The pier has all the provisions necessary for<br />

providing communications, water, and sewer services to the vessels while<br />

in port. It also has equipment for loading fuel, personnel, and equipment<br />

on board the vessels.<br />

Building 4<br />

Building 4 provides office and conference space for customer personnel.<br />

Also within building 4, a pair of remote control rooms is provided for<br />

customers who wish to control or monitor their operations in the PPF remotely.<br />

Building 3<br />

Building 3 (fig. 9-5) at the Home Port provides the facilities for the resident<br />

Home Port administrative and professional staff. This building consists<br />

of offices, a training area, conference rooms, and a break area.<br />

9-8 D688-10009-1 REV B

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!