2.4.8. Should late orders impact on the productivity of a vessel or berthing window by<br />

more than eight hours then such vessel may be requested to vacate and/or be rescheduled.<br />

2.5. Resource allocation<br />

2.5.1. Resources required for cargo working must be agreed at the Phase II and will be<br />

supplied subject to the Terminal’s limitations or constraints.<br />

2.5.2. Written requests for the booking of resources must be submitted to the relevant CPO<br />

by no later than the Phase II.<br />

2.5.3. The booking of additional resources as well as cancelling of resources must be in<br />

writing (faxed, emailed or hand delivered) and must be submitted to the relevant<br />

CPO. Notification must be submitted at least four (4) hours prior to the start of the<br />

relevant shift. TPT, in its sole discretion, may cancel or withdraw resources if<br />

satisfied that such resources are or will be underutilised, whether as a result of<br />

adverse weather conditions or the manner in which cargo working is being<br />

conducted.<br />

2.5.4. Cancellation of resources allocated to a vessel which is due to start working on<br />

weekends or on public holidays, must be communicated to TPT in writing before<br />

15h00 on the Friday, or the last business day before the public holiday, to enable<br />

TPT to cancel its resources timeously. Failure to do so will result in a minimum of<br />

four (4) hours being raised for stand-by charges for the vessel, determined by the<br />

number of resources allocated, per hatch, which have not been cancelled.<br />

Cancellation of resources on public holidays or on weekends for day shifts will result<br />

in a minimum of four (4) hours being raised and for night shifts, the full cost of the<br />

shift will be due and payable. Charges will not be raised in instances where TPT is<br />

able to redeploy the resources.<br />

2.6. Documents<br />

2.6.1. Phase II Forms and the Stowage Plan must be presented to the CPO at the Phase II.<br />

Any special requests or alterations to stowage plans must be submitted to TPT in<br />

writing and signed off by the CPO as acknowledged and incorporated in the original<br />

planning minute or amended planning minute. Should any outstanding documents<br />

prevent the planning of the vessel and in particular the heavy hatch, then such<br />

vessel will be re-scheduled.<br />

2.6.2. Phase II’s will be re-scheduled should any of the documents detailed in Clause 2.6.1<br />

above not be presented notwithstanding any late orders as described in clause 2.4.5.<br />

Terminal Operating Guidelines: Version 3 – <strong>Transnet</strong> Port Terminals Ro-Ro, Break-bulk, Bulk and Agricultural Terminals: 1 <strong>April</strong> 2013<br />

TRANSNET PORT TERMINALS, A DIVISION OF TRANSNET SOC Ltd 18