Version1: Applicable from 1 April 2011 - Transnet
Version1: Applicable from 1 April 2011 - Transnet
Version1: Applicable from 1 April 2011 - Transnet
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
6.3. Miscellaneous services<br />
6.4. Security<br />
6.5. Cargo pre-assembled prior to shipping<br />
6.6. Cargo dwell time<br />
6.7. Stacking/ stockpile<br />
6.8. Material safety data sheet<br />
6.9. Transhipments<br />
6.10. Road motor transport<br />
6.11. Abnormal cargo<br />
6.12. Mate’s receipts<br />
6.13. Flat-rack<br />
6.14. Third party equipment<br />
6.15. Harbour Mobile crane<br />
7. TOG for Saldanha Terminals incorporating;<br />
7.1.1. Saldanha Bulk Terminal<br />
7.1.2. Saldanha Ro-Ro, Break-bulk & Agricultural Terminal<br />
8. TOG for Cape Town Terminals (CTAR) incorporating;<br />
8.1.1. Cape Town Ro-Ro, Break-bulk & Agricultural Terminal<br />
9. TOG for Port Elizabeth Terminals incorporating;<br />
9.1.1. Port Elizabeth Ro-Ro, Break-bulk & Agricultural Terminal<br />
9.1.2. Port Elizabeth Bulk Terminal<br />
10. TOG for East London Terminals incorporating;<br />
10.1.1. East London Ro-Ro, Break-bulk & Agricultural Terminal<br />
11. Maydon Wharf Berth Planning Rules (Refer footnote TNPA guidelines)<br />
12. TOG for Durban Terminals incorporating;<br />
12.1.1. Durban Maydon Wharf Agri Ro-Ro Terminal<br />
12.1.2. Durban Agricultural Terminal Maydon Wharf<br />
12.1.3. Durban Ro-Ro<br />
13. TOG for Richards Bay Terminals incorporating<br />
13.1.1. Richards Bay Ro-Ro, Break-bulk & Agricultural Terminal<br />
13.1.2. Richards Bay Mineral Bulk Terminal<br />
14. TNPA Port Berthing Policy for berth 608, Richards Bay<br />
15. Dispute Resolution<br />
Terminal Operating Guidelines: Version 3 – <strong>Transnet</strong> Port Terminals Ro-Ro, Break-bulk, Bulk and Agricultural Terminals: 1 <strong>April</strong> 2013<br />
TRANSNET PORT TERMINALS, A DIVISION OF TRANSNET SOC Ltd 2