ANNEX CREEK/SALMON CREEK HYDROELECTRIC PROJECT<br />

<strong>FERC</strong> NO. 2307<br />

INFORMATION PACKET FOR<br />

PREFILING CONSULTATION - INITIAL MEETING<br />

January 17, 1985<br />

Introduction<br />

This packet of in<strong>for</strong>mation has been prepared to initiate <strong>the</strong> <strong>for</strong>mal<br />

prefiling consultation required by regulations of <strong>the</strong> Federal Energy Regulatory<br />

Commission (<strong>FERC</strong>) <strong>for</strong> relicensing of <strong>the</strong> <strong>Annex</strong> <strong>Creek</strong>/Salmon <strong>Creek</strong> Project<br />

(Project) and has been sent to all agencies listed in Attachment A.<br />

Following <strong>the</strong> scoping meeting, agencies with jurisdiction over<br />

resources or expressing interest in <strong>the</strong> relicensing will be contacted <strong>for</strong><br />

additional in<strong>for</strong>mation and discussion. Our goal is to address and resolve all<br />

issues prior to completion of <strong>the</strong> draft license application, which will be<br />

submitted to all of <strong>the</strong> agencies listed in Attachment A. Agencies will have<br />

60 days to comment on <strong>the</strong> draft application. The application will be finalized<br />

and filed with <strong>FERC</strong> by August 31, 1985.<br />

Project Description<br />

The Project includes existing developments at both Salmon and <strong>Annex</strong><br />

<strong>Creek</strong>s. Locations of <strong>the</strong> facilities are shown in Fig. 1.<br />

The Salmon <strong>Creek</strong> facility consists of a l65-foot concrete arch dam<br />

which <strong>for</strong>ms a reservoir with a maximum capacity of 19,000 acre-feet. Water<br />

from Salmon <strong>Creek</strong> Dam is conveyed downstream to <strong>the</strong> Upper Powerhouse by a<br />

4,477-foot-long steel pipe. <strong>Be<strong>for</strong>e</strong> reaching <strong>the</strong> powerhouse <strong>the</strong> penstock<br />

divides into a wye branch which diverts <strong>the</strong> water ei<strong>the</strong>r to <strong>the</strong> Upper Powerhouse<br />

or to ano<strong>the</strong>r penstock leading to <strong>the</strong> Lower Powerhouse. This flow is<br />

controlled by two butterfly valves. The Upper Powerhouse contains two 2,500-<br />

horsepower impulse wheels directly connected to a 1,400-kW generator. The<br />

rehabilitation of <strong>the</strong> Lower Salmon <strong>Creek</strong> Hydroelectric Facility that was completed<br />

in December 1984 will provide an additional 2.8 MW of capacity and an<br />

estimated 15,000,000 kWh annually.<br />

The <strong>Annex</strong> <strong>Creek</strong> facility consists of a 20-foot timber crib dam<br />

located at <strong>Annex</strong> Lake outlet. A l,420-foot-long t.unnel has been driven into<br />

<strong>the</strong> lake, which provides a drawdown of 150 feet and 22,000 acre-feet of storage.<br />

At <strong>the</strong> tunnel outletk a 34-inch pipe is used to control <strong>the</strong> water<br />

supply. The penstock is a riveted steel pipe and is 7,273 feet long. <strong>Annex</strong><br />

<strong>Creek</strong> Powerhouse contains two units, each consisting of a 2, SOO-horsepower<br />

impulse wheel, connected to a l,750-kVA generator. A 23-kV transmission line<br />

extends 12.4 miles between <strong>Annex</strong> <strong>Creek</strong> and Thane.