03.11.2014 Views

Before the FERC Application for New License for the Annex Creek ...

Before the FERC Application for New License for the Annex Creek ...

Before the FERC Application for New License for the Annex Creek ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

~lf~lf~ (OJ~ ~~~£[K\~<br />

•<br />

DEPT. OF ENVIRONMENTAL (;ONSERV.4TION<br />

R£~ST REGIONAL OFFICE<br />

MAY 1 t \.~: .<br />

~w'lIL~<br />

Mr. Willia. j. Corbus, Manager<br />

Alaska Electric Light & Power<br />

134 N. Franklin Street<br />

Juneau, AK 99801<br />

81LL SHEFFIEW, GOVERNOR<br />

r.'.phon.: (907J<br />

May 14, 1985<br />

Add~u: 789-3151<br />

P.O. Box 2420<br />

Juneau, Alaska<br />

CERTIFIED MAIL<br />

RETURN RECEIPT<br />

REQUESTED<br />

99803<br />

RE: Waiver, <strong>Annex</strong> <strong>Creek</strong>/Salmon <strong>Creek</strong> <strong>FERC</strong> Project No. 2307<br />

~droelectric Project<br />

You requested a water quality certification, pursuant to Section 401 of <strong>the</strong><br />

Clean Water Act of 19~J. Jor <strong>the</strong> existing developments at both Salmon and<br />

<strong>Annex</strong> <strong>Creek</strong>s.<br />

The Sal.an <strong>Creek</strong> facility consists of a 165-foot 'concrete arch dam which <strong>for</strong>ms<br />

a reservoir with a maximum.capacity of 19,000 arce-feet. Water from Salmon<br />

<strong>Creek</strong> 01. is conveyed downstream to <strong>the</strong> Upper Powerhouse by a 4477-foot-long<br />

steel pipe. <strong>Be<strong>for</strong>e</strong> reaching <strong>the</strong> powerhouse <strong>the</strong> penstock divides into a wye<br />

branch which diverts <strong>the</strong> water ei<strong>the</strong>r to <strong>the</strong> Upper Powerhouse or to ano<strong>the</strong>r penstock<br />

leading to <strong>the</strong> Lower Powerhouse. This flow is controlled by two butterfly<br />

valves. The Upper Powerhouse contains two 2500-horsepower impulse wheels directly<br />

connected to a 140O-kW geneator. The rehabilitation of <strong>the</strong> lower Salmon <strong>Creek</strong><br />

~droelectr1c Facility that was completed in December 1984 will provide an additiom.l<br />

2.8 MWof capacity and an estimated 15,000,000 kWh annually.<br />

The <strong>Annex</strong> <strong>Creek</strong> facility consists of a 20-foot timber crib dam located at <strong>Annex</strong><br />

Lake outlet. A 1420-foot-long tunnel has been driven into <strong>the</strong> lake, which provides<br />

I drawdown of 150 feet and 22,000 acre-feet of storage. At <strong>the</strong> tunnel outlet a<br />

34-incb pipe is used to control <strong>the</strong> water supply. The penstock is a riveted<br />

steel pipe and is 7273 feet long. <strong>Annex</strong> <strong>Creek</strong> Powerhouse contains two units,<br />

each cORsisting of a 2500-horsepower impulse wheel, connected to I 1750-kVA<br />

generator. A 23-kY transmission line extends 12.4 miles between <strong>Annex</strong> <strong>Creek</strong><br />

and Thane.<br />

The proposed activity is located on properties adjacent to Salmon <strong>Creek</strong> and<br />

<strong>Annex</strong> <strong>Creek</strong>, Juneau, Alaska.<br />

Water qaality certification is required <strong>for</strong> <strong>the</strong> proposed activity because<br />

<strong>the</strong> actt.ity ~11be authorized by a Department of <strong>the</strong> Army Permit identified<br />

as <strong>Annex</strong> <strong>Creek</strong>/Sal.on <strong>Creek</strong> ~droelectr1c Rel1censing, <strong>FERC</strong> Project No. 2307.<br />

and a dtscharge '" res~lt from <strong>the</strong> proposed activity.<br />