ATTACHMENT B<br />

PROJECT CHRONOLOGY<br />

October 24, 1963<br />

December 23, 1963<br />

September 1968<br />

March 23, 1973<br />

May 16, 1983<br />

July 23, 1984<br />

September 28, 1984<br />

November 1, 1984<br />

December 17, 1984<br />

Project license issued by <strong>the</strong> Federal Power Commission<br />

(FPC). The <strong>Annex</strong> <strong>Creek</strong>/Salmon <strong>Creek</strong> permit to operate<br />

was originally issued by <strong>the</strong> Secretary of <strong>the</strong> Department<br />

of <strong>the</strong> Interior in 1918. In 1963 <strong>the</strong> continued<br />

operation of <strong>the</strong> Project was authorized in <strong>the</strong> license<br />

issued to Alaska-Juneau (A-J) Industries by <strong>the</strong> FPC.<br />

The license was issued on <strong>the</strong> condition that A-J<br />

Industries rehabilitate both dams. The required modifications<br />

were completed by 1967.<br />

The FPC accepted A-J Industries' proposed modifications<br />

to FPC's license renewal requirments.<br />

The FPC approved <strong>the</strong> as-built construction drawings of<br />

<strong>the</strong> rehabilitation of both <strong>Annex</strong> <strong>Creek</strong> and Salmon <strong>Creek</strong><br />

facilities. A-J Industries prepared and submitted <strong>the</strong><br />

drawings.<br />

AnneX/Salmon <strong>Creek</strong> license was transferred from A-J<br />

Industries to Alaska Electric Light and Power Company<br />

(AELP).<br />

The Federal Energy Regulatory Commission (<strong>FERC</strong>, <strong>for</strong>merly<br />

FPC) granted AELP a license amendment to rehabilitate<br />

<strong>the</strong> Salmon <strong>Creek</strong> Project.<br />

<strong>FERC</strong> granted a fur<strong>the</strong>r amendment to <strong>the</strong> license to<br />

provide <strong>for</strong> <strong>the</strong> construction of a new powerhouse and<br />

change <strong>the</strong> penstock arrangement at Salmon <strong>Creek</strong>.<br />

<strong>FERC</strong> approved AELP I S amendment concerning a change in<br />

<strong>the</strong> maximum water level allowed to'flow through Salmon<br />

<strong>Creek</strong> Dam to mitigate concerns of dam stability under<br />

full water conditions.<br />

<strong>FERC</strong> approved AELP I S request to grant an easement <strong>for</strong><br />

<strong>the</strong> construction and operation of a water treatment<br />

facility by <strong>the</strong> City and Borough of Juneau, Alaska.<br />

<strong>New</strong> powerhouse on Salmon <strong>Creek</strong> went on-line.