APPENDIX A-1<br />

PROJECT LICENSE CHRONOLOGY<br />

Date<br />

January 24, 1918<br />

October 24, 1963<br />

December 23, 1963<br />

September 1968<br />

March 23, 1973<br />

May 16, 1983<br />

July 23, 1984<br />

September 28, 1984<br />

Event<br />

Joint Final Power Permit. The continued operation and<br />

ma; ntenance of <strong>the</strong> <strong>Annex</strong> <strong>Creek</strong> and Sa 1 mon <strong>Creek</strong> Hydroelectric<br />

Project was authorized in <strong>the</strong> Joint Power<br />

Permit issued to Alaska-Gastineau Mining Company by <strong>the</strong><br />

Department of <strong>the</strong> Interior and Department of Agriculture.<br />

The <strong>Annex</strong> <strong>Creek</strong> and Salmon <strong>Creek</strong> permit to<br />

construct and operate was originally issued by <strong>the</strong><br />

Secretary of Agri cu1 ture in 1915, but pursuant to <strong>the</strong><br />

Act of February 15, 1901 (31 Stat., 790), <strong>the</strong> Department<br />

of <strong>the</strong> Interior gained joint jurisdiction with <strong>the</strong><br />

Department of Agriculture over hydroelectric development.<br />

Project license issued by <strong>the</strong> Federal Power Commission<br />

(FPC). In 1963 <strong>the</strong> continued operation of <strong>the</strong> Project<br />

was authori zed in <strong>the</strong> 1 i cense issued to A-J Industri es<br />

by <strong>the</strong> FPC. The 1 i cense was issued on <strong>the</strong> cond i ti on<br />

that A-J Industri es rehabi 1 i tate both dams. The<br />

required modifications were completed by 1967.<br />

The FPC accepted A-J Industri es proposed modi fi cati ons<br />

to FPC's license renewal requirements.<br />

A-J Industries prepared and submitted <strong>the</strong> as-built construction<br />

drawings of <strong>the</strong> rehabilitation of both <strong>the</strong><br />

<strong>Annex</strong> <strong>Creek</strong> and Sa 1 mon <strong>Creek</strong> fac i 1 i ti es, wh i ch <strong>the</strong> FPC<br />

approved.<br />

<strong>Annex</strong> <strong>Creek</strong> and Salmon <strong>Creek</strong> license was transferred<br />

from A-J Industries to AELP.<br />

The Federal Energy Regulatory Commission (<strong>FERC</strong>, <strong>for</strong>merly<br />

FPC) granted AELP ali cense amendment to rehabi 1 i tate<br />

<strong>the</strong> Lower Salmon <strong>Creek</strong> Component.<br />

<strong>FERC</strong> granted a fur<strong>the</strong>r amendment to <strong>the</strong> 1 i cense to provide<br />

<strong>for</strong> <strong>the</strong> construction of a new powerhouse and change<br />

<strong>the</strong> penstock arrangement at Lower Salmon <strong>Creek</strong>.<br />

<strong>FERC</strong> approved AELP I S amendment concern; ng a change in<br />

<strong>the</strong> maximum water level allowed to be maintained behind<br />

Sa 1 mon <strong>Creek</strong> Dam to mi t i ga te concern s of dam stab i 1 i ty<br />

under full water conditions.