03.11.2014 Views

Before the FERC Application for New License for the Annex Creek ...

Before the FERC Application for New License for the Annex Creek ...

Before the FERC Application for New License for the Annex Creek ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Our corrnnents to <strong>the</strong> Federal Energy Regulatory Cornnission <strong>for</strong> <strong>the</strong> relicensing<br />

of this hydropower project will include <strong>the</strong> following recorrmendations. The<br />

licensee shall:<br />

]) Provide a permanently enclosed staging gauge to be established by<br />

survey.<br />

2) Require a minimum staging gauge depth of 1.4 feet which will reflect<br />

<strong>the</strong> corresponding discharge of 9 cfs. Should <strong>the</strong> physical character<br />

of <strong>the</strong> stream bed change such that 1.4 feet is no longer reflective<br />

of a 9 cfs, a new staging gauge valve would be established.<br />

3) Develop flow management operational plan which will ensure that<br />

minimum flows are maintained at all times and that -dumping- of<br />

impounded water will not occur.<br />

We appreciate <strong>the</strong> opportunity to cornnent on this action.<br />

Sincerely,<br />

Field Supervisor<br />

cc: FWS-ARD-HR, Anchorage<br />

AEL& P, Juneau<br />

R.W. Beck and Assoc, Inc, Seattle

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!