03.11.2014 Views

Before the FERC Application for New License for the Annex Creek ...

Before the FERC Application for New License for the Annex Creek ...

Before the FERC Application for New License for the Annex Creek ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ALASKA ELECTRIC LIGHT AND POWER COMPANY<br />

TEHPORARY PERf.lIT TO APPROPRIATE WATER<br />

ADL 51675-P<br />

ATTACHMENT A<br />

7 • The water level of Salmon <strong>Creek</strong> shall not fall<br />

below 1.4 feet as measured at <strong>the</strong> staging gauge.<br />

8. A precise description of <strong>the</strong> location and elevation<br />

of <strong>the</strong> staging gauge established by survey shall be<br />

provided by <strong>the</strong> applicant within 60 days of<br />

issuance of this permit. The staging gauge shall<br />

be permanently enclosed.<br />

9. Should <strong>the</strong>re be changes in <strong>the</strong> course or<br />

<strong>the</strong> stream, a new staging gauge value<br />

selected which corresponds to <strong>the</strong><br />

discharge in cubic feet per second as<br />

<strong>the</strong> 1.4 foot level on <strong>the</strong> staging gauge<br />

1985, approximately 9 cfs.<br />

contour<br />

should<br />

amount<br />

measured<br />

obse!:"ved<br />

of<br />

be<br />

of<br />

at<br />

in

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!