Des Moines Shoreline Master Program<br />

2. Fill needed to support the following water dependent uses may be allowed in all shoreline<br />

environments through a Shoreline Conditional Use Permit:<br />

a. Public access;<br />

b. Expansion, alteration, or repair of transportation facilities currently located with in the<br />

shoreline;<br />

c. Mitigation actions;<br />

d. Environmental, ecological, or watershed restoration projects;<br />

e. Beach nourishment or enhancement projects; and<br />

f. Soft shore bank stabilization projects.<br />

3. Permitted fill activities must comply with the following standards:<br />

a. Demonstration that alternatives to fill are not feasible;<br />

b. Demonstration that fill materials shall be of such quality that it will not adversely affect<br />

water quality;<br />

c. Demonstration that fill shall be deposited so as to minimize disruption of normal surface<br />

and ground water passage. Earth material which has no more than a minor amount of<br />

organic material and has no rock or similar irreducible material with a maximum<br />

dimension greater than eight inches shall be used;<br />

d. Demonstration that fill shall allow surface water penetration into the ground water<br />

supply, where such conditions exist prior to the fill; and<br />

e. Demonstration that landfill timing will minimize damage to water quality and aquatic<br />

life.<br />

4. Fill, except for beach nourishment, shall be prohibited in areas of high shoreline erosion<br />

potential.<br />

5. For allowed fill activities, the ground surface shall be prepared to receive fill by removing<br />

any unsuitable materials such as oversized rock, concrete slabs, tree stumps, brush, etc.<br />

6. Fill activities shall be designed to blend physically and visually with existing topography<br />

whenever possible. Perimeter banks shall be sloped no steeper than 1 foot vertical for every<br />

3 feet horizontal unless a specific engineering or geotechnical analysis has been provided and<br />

the Shoreline Administrator determines that the fill blends with existing topography.<br />

7. Fill located waterward of the ordinary high water mark, except for beach nourishment, shall<br />

be allowed only after full consideration is given to total water surface reduction, impediment<br />

to water flow and circulation, reduction of water quality and destruction of habitat.<br />

8. Fill within the one hundred-year (100-year) flood plain requires demonstration that landfill<br />

will not reduce the flood plain water storage capacity or in any way increase flood hazard so<br />

as to endanger public safety.<br />

9. An erosion and sediment control (ESC) plan shall be provided for all proposed fill activities.<br />

10. Fills shall be located, designed, and constructed to protect shoreline ecological functions and<br />

ecosystem-wide processes, including channel migration within stream subestuaries.<br />

Department of Ecology approval effective November 1, 2010<br />

74 Adopted by City of Des Moines Ordinance No. 1502