07.11.2014 Views

CITY OF DES MOINES SHORELINE MASTER PROGRAM

CITY OF DES MOINES SHORELINE MASTER PROGRAM

CITY OF DES MOINES SHORELINE MASTER PROGRAM

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Des Moines Shoreline Master Program<br />

11. Fills waterward of the ordinary high water mark (OHWM) for any use except ecological<br />

restoration shall require a conditional use permit.<br />

6.2.7 Land Clearing and Grading<br />

1. Land clearing and grading activities shall only be allowed in association with an allowed<br />

(permitted) shoreline development, subject to the Vegetation Conservation provisions of this<br />

SMP (Section 6.1.2).<br />

2. Land clearing and grading activities shall adhere to the following provisions:<br />

a. Slope. No slope of cut or fill surfaces shall be steeper than 2:1 unless approved by the<br />

Shoreline Administrator;<br />

b. Erosion/Sedimentation Control. All land clearing and grading shall be accomplished in a<br />

manner that minimizes erosion. All disturbed areas, including faces of cuts and fill<br />

slopes, shall be prepared and maintained to control erosion/sedimentation in accordance<br />

with the specifications of the surface water design manual. Prior to undertaking any land<br />

clearing or grading, the applicant shall submit for approval by the Shoreline<br />

Administrator, an erosion / sedimentation control (ESC) plan. The ESC plan shall set<br />

forth the specific measures from the surface water design manual to be utilized by the<br />

proposed project during (from beginning until the end) and following the construction.<br />

All land clearing and grading shall be consistent with the approved ESC plan;<br />

c. Excavations to Water-producing Depth. All excavations must be made to a waterproducing<br />

depth or grade to permit natural drainage. The excavations made to a waterproducing<br />

depth shall be reclaimed in the following manner:<br />

i. Depth of the excavation must not be less than two feet measured below the low water<br />

mark.<br />

ii. All banks shall be sloped to the water line no steeper than 2:1.<br />

iii. In no event shall the term “water producing depth” be construed to allow stagnant or<br />

standing water to collect or remain in the excavations.<br />

d. Bench Terrace. Benches at least 10 feet in width shall be back sloped and shall be<br />

established at no more than 10-foot vertical intervals to control surface drainage and<br />

debris. Swales or ditches on benches shall have a maximum gradient of one percent;<br />

e. Drainage. Provisions shall be made to prevent surface water or seepage from damaging<br />

the cut face of excavations or the sloping face of a fill and to carry surface waters that are<br />

or might be concentrated as a result of a fill or excavation to a natural watercourse or<br />

other means as approved by the code official. All development activities shall make<br />

provisions for drainage pursuant to the requirements of the surface water design manual.<br />

3. All land clearing and grading practices in shoreline areas shall be conducted t so there is no<br />

net loss of shoreline ecological functions.<br />

4. Tree brush and vine removal in steep slope and fragile areas shall be prohibited except as a<br />

measure to protect public safety. Nondestructive pruning for tree maintenance or view or<br />

aesthetic purposes is not affected by this regulation.<br />

Department of Ecology approval effective November 1, 2010<br />

Adopted by City of Des Moines Ordinance No. 1502 75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!