Where are your priorities? - Practical Facilities Management
Where are your priorities? - Practical Facilities Management
Where are your priorities? - Practical Facilities Management
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Fibreglass grating wins<br />
gold at 2004 Olympic<br />
In August 2004, the eyes of the<br />
world were on Athens and the<br />
Olympic Games Opening<br />
Ceremony, which promised to be<br />
history in the making.<br />
A ten thousand squ<strong>are</strong> foot manmade<br />
lake containing over two million<br />
litres of water covered almost<br />
the entire stadium floor. The show<br />
started with a pyrotechnic comet shooting through the <strong>are</strong>na to ignite<br />
the lake in the shape of the Olympic Rings.<br />
The lake was constructed around a vast submerged platform, which<br />
would enable the opening performers to appear to ‘walk on water’.<br />
When the water drained away, it created the platform on which thousands<br />
of performers and competitors would make their entrance and<br />
mark the start of the Games.<br />
With seventy-two thousand spectators in the stadium and an estimated<br />
four billion people watching worldwide, there could be no room for<br />
accidents or errors, and only one material met and exceeded specifications.<br />
Essex based company Fibreglass Grating Ltd were delighted to<br />
be contracted to supply the floor grating for this project.<br />
Further Information call 01255 423601<br />
<strong>Practical</strong> <strong>Facilities</strong> <strong>Management</strong><br />
RR:84073<br />
New ‘business park’ bollard<br />
from Bollards International<br />
With glass being used as an architectural<br />
feature to an ever greater extent in the<br />
new buildings being built to create business<br />
parks nationwide, Bollards International<br />
has launched a new bollard designed<br />
specifically for use in such environments.<br />
Bollards International manufacturers a<br />
range of polymer based bollards, railings<br />
and street furniture which <strong>are</strong> now being<br />
specified instead of the traditional cast iron<br />
products by a growing number of architects,<br />
development companies and local<br />
authorities.<br />
The first installation of the new silver painted polymer bollards has<br />
been made at the business village (three buildings) being leased by<br />
Fujitsu Services at Central Park in North East Manchester.<br />
The original product specification called for a stainless-steel bollard<br />
with two neoprene rings to protect the glass from accidental impact<br />
damage. 1-lowever, discussions with Bollards International resulted in<br />
the specification being changed to silver painted polymer as this<br />
weathers far better than stainless steel, which can often go dull and<br />
gain a brownish surface tinge. The manufacturer was also able to<br />
demonstrate that a polymer bollard offers a greater impact resistance<br />
than stainless steel. The final amendments to the specification saw the<br />
inclusion of polyurethane protection rings, rather than those originally<br />
specified as neoprene, for reasons of durability and longevity.<br />
Bame Colvin, Managing Director of Bollards International, believes this<br />
new bollard will have particular appeal in the business park environment,<br />
saying:<br />
“Visual impact is of great importance in the business park environment,<br />
and our new silver-coated polymer bollard gives the same overall<br />
impression of quality and design style without the drawbacks associated<br />
with impact performance and long term weathering.”<br />
The three buildings in the Fujitsu business village which <strong>are</strong> now protected<br />
by the new bollards house Fujitsu staff working in the IT services<br />
industry.<br />
Further Information call 011485 601155<br />
RR:84083<br />
Magiboards manufacture quality long lasting<br />
whiteboards and flipcharts<br />
Three quality whiteboard surfaces <strong>are</strong><br />
available to suit all budgets. Vitreous<br />
enamel steel is a high quality magnet/dry<br />
wipe/scratch resistant surface<br />
which provides a twenty five year surface<br />
guarantee. Coated steel is a magnet/dry<br />
wipe surface with a ten year<br />
surface guarantee and laminate is a dry<br />
wipe surface with a five year surface<br />
guarantee. All whiteboards <strong>are</strong> aluminium framed and come complete<br />
with fixing clips and instructions. Whiteboards <strong>are</strong> available in a range<br />
of sizes from 600 x 600mm to a 1200 x 3600mm. Bespoke cut board<br />
sizes <strong>are</strong> available by request. Flipcharts <strong>are</strong> available in a laminate or<br />
coated steel whiteboard surface and come complete with an Al pad.<br />
The frame is a sturdy powder coated steel frame which is height<br />
adjustable - three stops and a further stop for desk top use.<br />
Further Information call 01952 292111<br />
RR:84102<br />
55<br />
new product showcase<br />
Heatrae Sadia’s Supreme<br />
boiling water unit saves time<br />
in busy workplaces<br />
Supreme, Heatrae Sadia’s market leading<br />
instant boiling water unit, is ideal for<br />
busy workplaces with a constant need<br />
for boiling water to make tea, coffee and<br />
other hot drinks and snacks, such as<br />
school staff rooms, factories, large<br />
offices and call centres, prisons, fire stations<br />
and hospitals.<br />
Actually boiling enough water to meet the needs of everyone in the<br />
workplace using a kettle can take up a huge amount of time. This can<br />
infringe on a company’s productivity if employees <strong>are</strong> permitted to<br />
make drinks throughout the day, as well as employees’ own personal<br />
break time if they have allocated rest periods.<br />
Boiling water units provide an immediate and constant supply of boiling<br />
water for tea, coffee and other hot drinks and snacks, eliminating<br />
the need for a kettle and saving vast amounts of time by providing<br />
more boiling water than a kettle ever could.<br />
Available in wall mounted or counter top versions, Heatrae Sadia’s<br />
Supreme is permanently connected to the electricity and the cold<br />
water supply. Compact, neat and modern in design, Supreme heats<br />
water in an insulated storage vessel and features Intelliboil(tm), a<br />
patented electronic temperature management system which regularly<br />
brings water to boiling point in line with user demand.<br />
Supreme is available in various sizes - the three most popular being<br />
2.5 litre, 5.0 litre and 7.5 litre, sufficient for 15, 30 or 45 cups respectively<br />
when the unit is full, and equating to 140, 155 and 170 cups per<br />
hour. Catering sizes <strong>are</strong> also available, and two new larger capacity<br />
Supreme units <strong>are</strong> being introduced to satisfy increased market<br />
demands. The Supreme 310 and 560 offer capacities of 25 litres and<br />
40 litres respectively, delivering 310 and 560 cups per hour.<br />
The Supreme range is supported with a selection of accessories including<br />
stainless steel drip trays designed to be inset into the work surface,<br />
an integral seven day digital programmer, which allows Supreme to be<br />
switched on and off on a daily basis for greater economy, and a water<br />
filter system.<br />
Further Information call 01603 420100<br />
RR:84111<br />
New Ortus Fitness Resistance<br />
range from Physique<br />
Physique now offer the new innovative Ortus<br />
Fitness resistance training equipment which<br />
has undergone a total re-design, providing a<br />
quality durable range that is extremely safe<br />
and user friendly - and can provide the ideal<br />
competitive solution for many hotel gyms,<br />
health and leisure clubs and educational<br />
establishments working to budgets.<br />
The new Ortus bio-mechanics have been<br />
designed in conjunction with the ‘Biomechanical<br />
and Medical Engineering<br />
Department’ from the University of Valencia, studying exercising body<br />
movements and fusing this with leading engineering technology. The<br />
result is outstanding, as the new Ortus Fitness resistance range has<br />
achieved an impressive modern appearance with clean rounded edges.<br />
Further Information call 01282 863300<br />
RR:84012<br />
New V-Press 1160 Mill Sized<br />
Baler from HSM<br />
Recognising that space is at a premium, particularly<br />
inside industrial and commercial<br />
premises, HSM has now weather proofed<br />
their newest baler for external operation.<br />
The new V-Press 1160 produces a large millsized<br />
bale ideal for recycling and improved<br />
returns and is now suitable for exterior use.<br />
An advantage of producing mill size bales is<br />
that, because of the reduced transport costs and more economic handling,<br />
this can result in a higher price being obtained from the processor<br />
or recycler, or even directly from a mill itself, for the waste material.<br />
Therefore, the capital cost of the new V-Press 1160 Baler, which<br />
is very competitively priced, can be recouped that much quicker.<br />
Alternatively, lease purchase and rental options will allow cost savings<br />
to be made on a weekly / monthly basis. The new V-Press 1160 Baler<br />
is weather proofed to IP55 and easy to operate thanks to features that<br />
include: a large feed hopper at a convenient loading height, guide rails<br />
in the chamber for insertion of the strapping tapes or wires from the<br />
front of the machine, and simple selection of the torsion control.<br />
Further Information call 01543 272480<br />
RR:84019