08.11.2014 Views

quakers_walk_planning_brief.pdf Quakers Walk ... - Wiltshire Council

quakers_walk_planning_brief.pdf Quakers Walk ... - Wiltshire Council

quakers_walk_planning_brief.pdf Quakers Walk ... - Wiltshire Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

QUAKERS WALK, DEVIZES<br />

• The need for improvements to upgrade <strong>Quakers</strong> <strong>Walk</strong> to<br />

shared use facility for pedestrians and cyclists.<br />

• Provision of a bus gate to restrict access from Roundway<br />

Park into the <strong>Quakers</strong> <strong>Walk</strong> site, and parking restrictions on<br />

Roundway Park.<br />

Figure 3.1:Public Exhibition<br />

Board 4: Primary School<br />

Issues.<br />

Figure 3.2: Area allocated<br />

for primary school in the<br />

Local Plan.<br />

3.33 The <strong>Quakers</strong> <strong>Walk</strong> site is required to provide 1,705sqm of<br />

equipped play area (with no one part of the wider provision to<br />

be less than 400sqm) and 2,255sqm of casual play area (with<br />

no one part of the wider provision to be less than 750sqm).<br />

The requirements are based upon approximately 230 new<br />

residential units. In addition to appropriate play equipment,<br />

the casual play areas should provide an informal meeting<br />

area for teenagers. A financial contribution is required<br />

towards off-site provision of formal sports pitches. These<br />

requirements are based upon development of approximately<br />

230 new residential units.<br />

3.34 In relation to the proposed new primary school, the Strategic<br />

Brief requires that consideration is given to providing an<br />

enlarged facility, to cater for pupils currently attending St<br />

Peter’s School, which is to close. The Local Education<br />

Authority supports the proposal and has requested that<br />

consideration is also given to locating the new school further<br />

to the south (but still within the proposed development area).<br />

A location to the south of the site would be closer to the<br />

existing catchment population for St Peters School, as well as<br />

Devizes Sports Club.<br />

FIGURE 3.1<br />

3.35 A larger primary school will require a 1.45 hectare site (rather<br />

than the 1.2 hectare site identified on the Local Plan<br />

Proposals Map) to accommodate the increase from a 7-form<br />

to a 10-form primary school. In addition to provision of the<br />

site, the <strong>Quakers</strong> <strong>Walk</strong> development will make a substantial<br />

contribution to the construction costs of the new school.<br />

3.36 The Devizes Strategic Development Brief also requires<br />

significant contributions from the <strong>Quakers</strong> <strong>Walk</strong> development<br />

towards secondary education, sustainable transport and FIGURE 3.2<br />

updating of the Devizes SATURN Traffic Model. Ref: 04744<br />

May 2005<br />

Issue Number 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!