FINAL<br />

<strong>Phase</strong> IB <strong>Underwater</strong> <strong>Archaeological</strong> Resources <strong>Report</strong> <strong>for</strong> <strong>Onondaga</strong> Lake Superfund Site<br />

Recommendations<br />

LCMM’s analysis suggests that A20 retains integrity and is eligible <strong>for</strong> <strong>the</strong> National Register of Historic<br />

Places under Criteria C and D. The remedial design <strong>for</strong> <strong>the</strong> area calls <strong>for</strong> capping. As per <strong>the</strong> Section 106<br />

process, LCMM has recommended avoiding adverse impacts to A20. In response, <strong>the</strong> remedial design<br />

has been altered to avoid depositing cap materials on <strong>the</strong> site.<br />

A20 should be marked during remedial activities to ensure that no adverse impacts occur via <strong>the</strong><br />

inadvertent anchoring of work vessels.<br />