12.11.2014 Views

Phase 1B Underwater Archaeological Report for the Onondaga ...

Phase 1B Underwater Archaeological Report for the Onondaga ...

Phase 1B Underwater Archaeological Report for the Onondaga ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FINAL<br />

<strong>Phase</strong> IB <strong>Underwater</strong> <strong>Archaeological</strong> Resources <strong>Report</strong> <strong>for</strong> <strong>Onondaga</strong> Lake Superfund Site<br />

A38 0955 Magnetometer anomaly without sonar. Side scan showed lots of tires and o<strong>the</strong>r debris but nothing historic. Water was<br />

very shallow <strong>for</strong> this near shore target. Visibility in <strong>the</strong> water was not good due to waves and poor sun. Some glimpses<br />

of possible structure but nothing conclusive.<br />

1005 Done with Anomaly 38<br />

A1 , 2 & 3 1010 Arrive anomalies A1-3. A1 is a barge; A2 Salina Pier; A3 is a possible barge. A1 is visible just above <strong>the</strong> surface. A3 really<br />

unclear-need john boat <strong>for</strong> <strong>the</strong>se.<br />

1030 Done with A1-3Done with all official Side Scan sites<br />

1045 Arrive Tug Stillwater to collect some nice images.<br />

1100 Done with Stillwater<br />

A15 1105 Arrive at Anomaly 15 to collect nice images.<br />

1120 Back at marina <strong>for</strong> lunch. Spoke with Pete Petrone about <strong>the</strong> metro outfall and mystery bulkhead to be imaged. A<br />

change order has been issued <strong>for</strong> that work, so we will proceed with those anomalies.<br />

1200 Prep <strong>for</strong> scanning sonar work and CW works on side scan mosaics.<br />

1245 Depart marina <strong>for</strong> Parson’s docks.<br />

1255 Arrive at dock to pick up map of additional anomalies to investigate.<br />

1315 Arrive at Metro outfall <strong>for</strong> engineering survey. Thoughts on barges/sites in <strong>the</strong> sou<strong>the</strong>rn end. The sites individually may<br />

lack significance, but as a whole may constitute a maritime industrial district.<br />

1420 Done with Metro Outfall<br />

1425 At dock to discuss outfall and wooden bulkhead feature of wastebed B.<br />

1430 Depart dock to go to wooden wall feature. The area is too shallow to get ROV into, so operation is postponed until john<br />

boat is operational.<br />

1440 Depart wall feature<br />

A48 1445 Arrive at Anomaly 48. Navigation was not functioning <strong>for</strong> this one when it was done on 6/2, so we have to resurvey it.<br />

1455 Done with Anomaly 48<br />

A19 1455 Re-look visually <strong>for</strong> Anomaly 19. Still nothing. Excellent visibility but 100% weed over rising about 3’ above <strong>the</strong> bottom<br />

1505 Done with SS survey. Going back to marina to set up sector scan.<br />

1510 At marina. Set up and testing sector scan sonar.<br />

1700 Depart Marina<br />

1720 Back at hotel<br />

188

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!