<strong>Phase</strong> IB <strong>Underwater</strong> <strong>Archaeological</strong> Resources <strong>Report</strong> <strong>for</strong> <strong>Onondaga</strong> Lake Superfund Site<br />

A19 1310 Leave dock to re-survey A19. Quite rough; not very good data., but apparently sufficient to rectify compass issues.<br />

1345 Done with A19<br />

1355 Back at Marina. Break down scanning sonar and gear up <strong>for</strong> ROV<br />

1500 ROV up and running<br />

1630 Depart marina <strong>for</strong> <strong>the</strong> day.<br />

1700 Back at hotel<br />

6/08/2010 <strong>Onondaga</strong> <strong>Phase</strong> <strong>1B</strong> ROV Survey<br />

0650 At <strong>the</strong> marina.<br />

Crew: AK, EP, BC, SD, KM<br />

0735 Leaving Marina<br />

A3 0805 Arrive A3 Barge next to Salina Pier <strong>for</strong> ROV work.<br />

0810 ROV into <strong>the</strong> water. Barge is scow ended-interesting framing with transverse beams running in <strong>the</strong> middle of <strong>the</strong> hold.<br />

Quite a bit of timber stacked inside <strong>the</strong> hull suggesting a heavily built boat. Barge has a wale along <strong>the</strong> exterior of <strong>the</strong><br />

side. Could not get any interior in<strong>for</strong>mation from <strong>the</strong> end- just too hard to get into. Edge fastened. Boat is built with<br />

transverse beams set on <strong>the</strong> chine log and longitudinal stringers. There are two stringers in each side of <strong>the</strong> hull.<br />

0925 Done with A3<br />

A2 0930 Arrive A2. Inspection of “thumb pier” area. Some brief views of rocks and a few vertical planks and timbers. Very weedy<br />

and difficult to discern any patterns<br />

1030 Move onto A2 area called “ROV Spot” where we viewed some planks on <strong>the</strong> bottom on 6/04/2010. Saw at least 4<br />

vertical posts (4x4 or 6x6) in a row. They could denote <strong>the</strong> end of <strong>the</strong> pier. Viewed several more vertical planking pieces,<br />

but could not make out anything coherent due to extremely heavy weed growth. There is some concern here that <strong>the</strong><br />

pier would have been made out of boats and nothing seen so far would disprove that.<br />

1130 Done with A2<br />

1145 Docked at Parson’s dock <strong>for</strong> lunch<br />

A51 1215 Depart dock <strong>for</strong> A51. Make several attempts to anchor, but wind (15-20 knots with gusts to 25) makes it impossible.<br />

A51 1245 Leave A51 <strong>for</strong> A30<br />

A30<br />

A30 1315 Arrive A30 Maple Bay Pier<br />

1320 ROV into <strong>the</strong> water. A30 incredibly dense weeds, especially on <strong>the</strong> pier itself. ROV was able to get a good look along <strong>the</strong><br />

sou<strong>the</strong>astern face in very shallow water, too shallow <strong>for</strong> milfoil. Constructed with vertical planks and stone fill.<br />

1405 Done with A30<br />

192