FINAL<br />

<strong>Phase</strong> IB <strong>Underwater</strong> <strong>Archaeological</strong> Resources <strong>Report</strong> <strong>for</strong> <strong>Onondaga</strong> Lake Superfund Site<br />

6/1/2010 <strong>Onondaga</strong> <strong>Phase</strong> <strong>1B</strong> Mobilization<br />

900 Depart Vermont-just AK<br />

1430 Arrive Liverpool at Marina. Meet with CR Environmental crew (Chip Ry<strong>the</strong>r, Chris Wright, Shipherd Densmore) and<br />

Parsons Safety person Dale Dolph.<br />

1530 Depart Marina <strong>for</strong> drug testing facility<br />

1600- Drug testing/ breathalyzer<br />

1630<br />

1700 Arrive back at marina <strong>for</strong> continuation of set up<br />

1800 Set up completed. Crew has discussion of project requirements, logistics and safety<br />

1815 Depart Marina<br />

6/2/2010 <strong>Phase</strong> <strong>1B</strong> <strong>Onondaga</strong> Side Scan Sonar<br />

0600 Depart hotel with crew <strong>for</strong> breakfast: AK, CR, DD, SD<br />

0700 At <strong>the</strong> dock<br />

0705 Depart Marina <strong>for</strong> Parson’s dock<br />

0730 At Parson’s dock<br />

0740 At Parson’s trailer <strong>for</strong> safety briefing. Briefing by DD, Pete Petrone in attendance; sign secrecy <strong>for</strong>ms, safety<br />

acknowledgement <strong>for</strong>ms, float plan<br />

0830 Depart trailer <strong>for</strong> boat<br />

0845 Depart Parson’s dock <strong>for</strong> marina<br />

0900 At marina <strong>for</strong> set up<br />

0945 Depart marina <strong>for</strong> side scan survey work<br />

A30 0955 Maple Bay Pier<br />

1005 Sonar into <strong>the</strong> water. Visual inspection of pier shows it to be heavily covered in milfoil. Pier outline is defined by<br />

collection of milfoil on <strong>the</strong> surface. Construction looks to be vertical planks (+/- 1’ wide) making up <strong>the</strong> exterior wall.<br />

One pass off SS along sou<strong>the</strong>rn face (going EW) showed SS to be ineffective through milfoil. Did pass along eastern face<br />

(going S-N) and picked up faint image of dock.<br />

1023 Depart Anomaly 30<br />

A22 1030 At Anomaly 22. Pleasant Beach Resort dock. Visual inspection shows it to be very shallow and generally well preserved.<br />

Again, lots of milfoil-like A30. Looks to be timber crib with rock fill. Outline of dock was very clearly visible from <strong>the</strong><br />

surface. Excellent integrity.<br />

1041 Depart Anomaly 22<br />

185