Database - United Nations in Bangladesh
Database - United Nations in Bangladesh
Database - United Nations in Bangladesh
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Energy 125<br />
6.3 Natural Gas and Oil<br />
Table 6.3.1 Relevant Information on Seven Ammonia-urea Complexes<br />
Complex NGFF UFFL ZFCL PUFF CUFL JFCL KAFCO<br />
Location Fenchuganj Ghorashal Ashuganj Polash Rangadia Tarakandi Rangadia<br />
Gas field from where Sylhet Titas Titas Titas Bakhrabad Titas Bakhrabad<br />
NG supplied [1]<br />
Year of Commission<strong>in</strong>g 1961 1970 1981 1986 1987 1991 1995<br />
Plant Capacity, t/year<br />
Urea 106,000 469,260 [2] 528,000 95,000 561,000 561,000 575,425<br />
Ammonia 66,000 272,250 [2] 307,000 56,160 330,000 355,740 499,500<br />
Type of Urea Produced Prilled Prilled Prilled Prilled Prilled Granulated Granulated<br />
Electric Power Captive Captive Captive Captive Captive Captive Captive<br />
Ammonia Process CCC (USA) Toyo Uhde Ch<strong>in</strong>a Kellog Holder Holder<br />
Licenser Topsoe Topsoe<br />
Urea Process Licenser CCC (USA) (TEC Stamicarbon Ch<strong>in</strong>a TEC-MTC Snamprog Stamicarbon<br />
- MTC C- -D-Process etti<br />
Process)<br />
ACES<br />
CO 2 removal [3] system CCC (USA) (Vetrocoke) Benfield Benfield Benfield Benfield UOP<br />
for the reformed gases<br />
Benfield<br />
Type of Compression<br />
1. ammonia synthesis Reciprocat<strong>in</strong>g Centrifugal Reciprocat<strong>in</strong>g Centrifugal Centrifugal Centrifugal Centrifugal<br />
2. urea synthesis Reciprocat<strong>in</strong>g Centrifugal Reciprocat<strong>in</strong>g Centrifugal Centrifugal Centrifugal Centrifugal<br />
Source : BCIC (2001) Quader (1998)<br />
Notes : 1. When Commissioned<br />
2. Capacity after revamp<strong>in</strong>g (orig<strong>in</strong>ally urea 340,000 t/year; ammonia 200,000 t/year) Orig<strong>in</strong>al Process