FRANKLIN BOULEVARD STUDY CONCEPT DESIGN REPORT<br />

<strong>City</strong> Council also directed the project team to continue studying a three-lane enhanced<br />

arterial concept for McVey <strong>Boulevard</strong>. They also directed the team to continue considering<br />

a roundabout option and signalized option at the intersection <strong>of</strong> <strong>Franklin</strong> <strong>Boulevard</strong> and the<br />

McVey Highway.<br />

Concepts set-aside at design workshop<br />

The alignments shown below were set aside during the design workshop.<br />

<br />

<br />

<br />

<br />

The “blue” concept would have encroached on the Greenway and reduced development<br />

potential near the Willamette River.<br />

The “green” concept would have required expensive relocations <strong>of</strong> major facilities such<br />

as the Lane Transit District headquarters.<br />

The “brown” concept would have required development on four frontages <strong>of</strong> the<br />

<strong>Franklin</strong>/14 th couplet to create an activated district and would have reduced traffic flow<br />

on <strong>Franklin</strong> <strong>Boulevard</strong> creating a less attractive retail environment.<br />

The “red” concept would have impacted residential areas and would have created a<br />

bypass that would compete with <strong>Franklin</strong> <strong>Boulevard</strong> for retail development.<br />

Comments from Stakeholder Advisory Committee members and the general public<br />

supported the team’s recommendation to set these concepts aside.<br />

Concept evaluation and narrowing<br />

The project team then evaluated the nine concepts against the agreed-upon criteria. Some<br />

criteria or criteria categories were not used in this process as they did not help differentiate<br />

between concepts. The detailed concept evaluation matrix is attached to this report.<br />

The criteria that best differentiated between alternatives included:<br />

Minimize project costs<br />

Minimize right-<strong>of</strong>-way acquisition<br />

Minimize impacts to businesses and residences<br />

Minimize impacts to private property<br />

There were some trade-<strong>of</strong>fs between the multiway boulevard and arterial options. The<br />

multiway boulevard options all created a better pedestrian environment than arterial<br />

options because sidewalks were adjacent to low-traffic roadways. The multiway boulevard<br />

options also separated local and regional traffic better than arterial options. The arterial<br />

options typically had lower project costs (excluding right-<strong>of</strong>-way) than the multiway<br />

boulevard options.<br />

The 14 th Street alignment option would be more difficult to construct in phases than either<br />

<strong>of</strong> the existing alignment options. The existing alignment widened to both the north and<br />

south had more impacts to businesses and private property than the existing alignment<br />

widened south concept.<br />

3 6/19/2009<br />

CH2M HILL