22.11.2014 Views

Franklin Boulevard Study - City of Springfield

Franklin Boulevard Study - City of Springfield

Franklin Boulevard Study - City of Springfield

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CH2M HILL<br />

SUMMARY - QUICK COST ESTIMATE<br />

PROJECT: <strong>Franklin</strong> <strong>Boulevard</strong> <strong>Study</strong> - 14th Ave. Multi-<br />

DESIGN LEVEL:<br />

KIND OF WORK:<br />

Way<br />

Planning<br />

Roadway<br />

PREPARED BY:<br />

Billy Adams / 503.235.5000<br />

LENGTH (MILE):<br />

0.76<br />

DATE:<br />

6/19/2009<br />

SHEET:<br />

1 <strong>of</strong> 1<br />

NO. ITEM<br />

UNIT QUANTITY UNIT COST COST<br />

1 Curb, Gutter, Sidewalks & Drainage Mi. 2.3 $1,097,900.00 $2,495,227<br />

2 Bike <strong>Boulevard</strong><br />

Mi. $140,600.00 $0<br />

3 New Roadway<br />

Lane-Mi. 8.3 $358,200.00 $2,985,000<br />

4 Overlay Existing Roadway<br />

Lane-Mi. $61,300.00 $0<br />

5 Reconstruct Existing Roadway Lane-Mi. $107,100.00 $0<br />

6 Intersection Widening<br />

EA $68,400.00 $0<br />

7 Roundabouts<br />

EA $1,100,000.00 $0<br />

8 Restriping Existing Roadway<br />

Lane-Mi. $8,700.00 $0<br />

9 Interconnect Signal<br />

LS $35,000.00 $0<br />

10 New Signal<br />

EA 1 $250,000.00 $250,000<br />

11 Signal Modifications<br />

EA $65,000.00 $0<br />

12 Transit Enhancements<br />

EA $25,000.00 $0<br />

13 Traffic Calming<br />

5-10% - $0<br />

14 Illumination<br />

Mi. 1.5 $260,000.00 $393,939<br />

15 Landscaping<br />

Mi. 1.5 $235,000.00 $356,061<br />

16 Bridges<br />

SF $0<br />

17 Walls<br />

SF<br />

SUBTOTAL<br />

$50.00 $0<br />

$6,480,227<br />

ADDITIONAL CONST. COSTS<br />

Construction Surveying<br />

TP & DT<br />

Mobilization<br />

Erosion Control<br />

Contingency<br />

Escalation (per year)<br />

Design Year<br />

Construction Year<br />

SUGGESTED PERCENTAGE<br />

COST<br />

1.0-2.5% 2.5% $162,000<br />

3.0-8.0% 4.0% $259,200<br />

8.0-10.0% 10.0% $648,000<br />

0.5-2.0% 2.0% $129,600<br />

30-40% 40.0% $2,592,100<br />

0.5-2.0%<br />

$0<br />

$0<br />

TOTAL CONSTRUCTION COST<br />

$10,271,127<br />

RIGHT OF WAY COSTS<br />

UNIT QUANTITY UNIT COST COST<br />

Right <strong>of</strong> Way Acquisition<br />

SF 497,250 $0.00 $0<br />

Business Acquisition<br />

High Residential EA $0.00 $0<br />

Buisness EA $0.00 $0<br />

Medium Residential EA $0.00 $0<br />

Buisness EA $0.00 $0<br />

ENGINEERING COSTS SUGGESTED PERCENTAGE<br />

COST<br />

Design Engineering<br />

13.0% 13.0% $1,335,200<br />

Construction Engineering<br />

10.0% 10.0% $1,027,100<br />

TOTAL PROJECT COST<br />

Assumptions:<br />

Based on 2007 Dollars<br />

Existing Roadway Will Be Removed<br />

Supporting BRT Features Are Not Included (Shelters, Signing, etc.)<br />

<strong>Franklin</strong>/Glenwood Intersection is Assumed To Be Signalized<br />

$12,600,000

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!