22.11.2014 Views

Franklin Boulevard Study - City of Springfield

Franklin Boulevard Study - City of Springfield

Franklin Boulevard Study - City of Springfield

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Stakeholder Advisory Committee Meeting #4<br />

August 2, 2007<br />

5:00 pm<br />

Kristin Hull – just a check-in to show the work that we did today. Primarily work on<br />

alignments and cross-sections.<br />

Sam Seskin – cross-sections show ranges for dimensions. Carried forward 3<br />

alternatives: improved arterial, hybrid arterial, and multiway boulevard. Also have 3<br />

alignment alternatives: 1) Existing <strong>Franklin</strong>, widen from center 2) Existing <strong>Franklin</strong>,<br />

widen to South and 3) 14 th Street, widen to North.<br />

Dave Carvo – have we thought about what kind <strong>of</strong> increase in carrying capacity these<br />

changes will make?<br />

Brian Ray – won’t increase the auto capacity considerably, but that’s ok because a 5-lane section<br />

has plenty <strong>of</strong> capacity.<br />

Greg Mott – do any <strong>of</strong> these options require LTD to move?<br />

Sam Seskin – No<br />

Sam Seskin – Group also considered, but did not carry forward 4 alignments.<br />

Dave Carvo – group has come up with the same thing as everybody else that has looked<br />

at the issue over the last 10 years. The concepts are the right things, but they are too<br />

politically hard to actually accomplish. Widening to the South along current alignment<br />

would be the correct thing to do.<br />

Group spent time to look more closely at the developed concepts and share their<br />

opinions.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!