22.11.2014 Views

Franklin Boulevard Study - City of Springfield

Franklin Boulevard Study - City of Springfield

Franklin Boulevard Study - City of Springfield

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CH2M HILL<br />

SUMMARY - FRANKLIN/McVAY INTERSECTION COST ESTIMATE SUMMARY<br />

PROJECT:<br />

<strong>Franklin</strong> <strong>Boulevard</strong> <strong>Study</strong><br />

DATE:<br />

SHEET:<br />

DESIGN LEVEL:<br />

Planning<br />

6/19/2009 1 <strong>of</strong> 3<br />

Alternative Right-<strong>of</strong>-Way Impacts (sf) Rank<br />

Private Property/ Business Impacts<br />

LOW MEDIUM HIGH<br />

Project Cost<br />

Rank<br />

Roundabout<br />

Signal<br />

499,374 1 4 10 $4,100,000 1<br />

500,945 2 3 11 $4,500,000 2<br />

― Items Included In This Estimate:<br />

Engineering Design & Construction Fees<br />

New Asphalt Concrete and Aggregate Base<br />

Excavation / Embankment<br />

Pavement Markings<br />

Concrete Curbs<br />

Sidewalks<br />

Drainage<br />

Erosion Control<br />

Illumination<br />

Traffic Signals<br />

Landscaping<br />

Mobilization<br />

Contingency<br />

Page 1 <strong>of</strong> 8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!