Franklin Boulevard Study - City of Springfield
Franklin Boulevard Study - City of Springfield
Franklin Boulevard Study - City of Springfield
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CH2M HILL<br />
SUMMARY - FRANKLIN/McVAY INTERSECTION COST ESTIMATE SUMMARY<br />
PROJECT:<br />
<strong>Franklin</strong> <strong>Boulevard</strong> <strong>Study</strong><br />
DATE:<br />
SHEET:<br />
DESIGN LEVEL:<br />
Planning<br />
6/19/2009 1 <strong>of</strong> 3<br />
Alternative Right-<strong>of</strong>-Way Impacts (sf) Rank<br />
Private Property/ Business Impacts<br />
LOW MEDIUM HIGH<br />
Project Cost<br />
Rank<br />
Roundabout<br />
Signal<br />
499,374 1 4 10 $4,100,000 1<br />
500,945 2 3 11 $4,500,000 2<br />
― Items Included In This Estimate:<br />
Engineering Design & Construction Fees<br />
New Asphalt Concrete and Aggregate Base<br />
Excavation / Embankment<br />
Pavement Markings<br />
Concrete Curbs<br />
Sidewalks<br />
Drainage<br />
Erosion Control<br />
Illumination<br />
Traffic Signals<br />
Landscaping<br />
Mobilization<br />
Contingency<br />
Page 1 <strong>of</strong> 8