PROJECT:<br />

<strong>Franklin</strong> <strong>Boulevard</strong> <strong>Study</strong>:<br />

DESIGN LEVEL:<br />

KIND OF WORK:<br />

<strong>Franklin</strong>/McVay Intersection - Signalized<br />

Planning<br />

Roadway<br />

PREPARED BY:<br />

Billy Adams / 503.235.5000<br />

LENGTH (MILE):<br />

0.51<br />

DATE:<br />

6/19/2009<br />

SHEET:<br />

1 <strong>of</strong> 1<br />

NO. ITEM<br />

UNIT QUANTITY UNIT COST COST<br />

1 Curb, Gutter, Sidewalks & Drainage Mi. 0.51 $1,097,900.00 $559,555<br />

2 Bike <strong>Boulevard</strong><br />

Mi. $140,600.00 $0<br />

3 New Roadway<br />

Lane-Mi. 3.3 $358,200.00 $1,178,346<br />

4 Overlay Existing Roadway<br />

Lane-Mi. $61,300.00 $0<br />

5 Reconstruct Existing Roadway Lane-Mi. $107,100.00 $0<br />

6 Restriping Existing Roadway<br />

Lane-Mi. $8,700.00 $0<br />

7 Interconnect Signal<br />

LS $35,000.00 $0<br />

8 New Signal<br />

EA 1 $250,000.00 $250,000<br />

9 Signal Modifications<br />

EA $65,000.00 $0<br />

10 Transit Enhancements<br />

EA $25,000.00 $0<br />

11 Traffic Calming<br />

5-10% - $0<br />

12 Illumination<br />

Mi. 0.51 $260,000.00 $132,511<br />

13 Landscaping<br />

Mi. 0.51 $235,000.00 $119,770<br />

14 Bridges<br />

SF $0<br />

15 Walls<br />

SF $50.00 $0<br />

16 Concrete Islands<br />

SF 4,442<br />

SUBTOTAL<br />

$12.00 $53,304<br />

$2,293,486<br />

ADDITIONAL CONST. COSTS<br />

Construction Surveying<br />

TP & DT<br />

Mobilization<br />

Erosion Control<br />

Contingency<br />

Escalation (per year)<br />

Design Year<br />

Construction Year<br />

CH2M HILL<br />

SUMMARY - QUICK COST ESTIMATE<br />

SUGGESTED PERCENTAGE<br />

COST<br />

1.0-2.5% 2.5% $57,300<br />

3.0-8.0% 4.0% $91,700<br />

8.0-10.0% 10.0% $229,300<br />

0.5-2.0% 2.0% $45,900<br />

30-40% 40.0% $917,400<br />

0.5-2.0%<br />

2008 $0<br />

$0<br />

TOTAL CONSTRUCTION COST<br />

$3,635,086<br />

RIGHT OF WAY<br />

UNIT QUANTITY<br />

Right <strong>of</strong> Way Acquisition<br />

SF 500,945<br />

Business Acquisition<br />

High EA 11<br />

Medium EA 3<br />

ENGINEERING COSTS SUGGESTED PERCENTAGE<br />

COST<br />

Design Engineering<br />

13.0% 13.0% $472,600<br />

Construction Engineering<br />

10.0% 10.0% $363,500<br />

TOTAL PROJECT COST<br />

Assumptions:<br />

Based on 2007 Dollars<br />

Existing Roadway Will Be Removed<br />

Supporting BRT Features Are Not Included (Shelters, Signing, etc.)<br />

Used for Comparison <strong>of</strong> Signal vs. Roundabout Only<br />

$4,500,000