CH2M HILL<br />

SUMMARY - ALTERNATIVE COST ESTIMATE SUMMARY<br />

PROJECT:<br />

<strong>Franklin</strong> <strong>Boulevard</strong> <strong>Study</strong><br />

DATE:<br />

SHEET:<br />

DESIGN LEVEL:<br />

Planning<br />

6/19/2009 1 <strong>of</strong> 7<br />

Alternative Right-<strong>of</strong>-Way Impacts (sf) Rank<br />

Private Property/ Business Impacts<br />

LOW MEDIUM HIGH<br />

Project Cost<br />

Rank<br />

Multi-Way Center<br />

Multi-Way South<br />

Arterial Center<br />

Arterial South<br />

14th Ave. Arterial<br />

14th Ave. Multi-Way<br />

430,540 5 0-3 4-6 20-25 $13,100,000 5<br />

418,150 4 0-2 1-3 18-24 $13,100,000 5<br />

235,810 1 0-2 2-5 14-18 $7,500,000 2<br />

238,800 2 2-3 2-3 12-14 $7,500,000 2<br />

356,330 3 3-4 3-5 15-20 $7,200,000 1<br />

497,250 6 3-6 4-6 20-28 $12,600,000 4<br />

― Items Included In This Estimate:<br />

Engineering Design & Construction Fees<br />

New Asphalt Concrete and Aggregate Base<br />

Excavation / Embankment<br />

Pavement Markings<br />

Concrete Curbs<br />

Sidewalks<br />

Drainage<br />

Erosion Control<br />

Illumination<br />

Traffic Signals<br />

Landscaping<br />

Mobilization<br />

Contingency<br />

McVay Intersection is not being addressed at this time.<br />

Page 1 <strong>of</strong> 8