Franklin Boulevard Study - City of Springfield
Franklin Boulevard Study - City of Springfield
Franklin Boulevard Study - City of Springfield
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Transit Enhancements (Unit: Each)<br />
ITEM UNIT AMOUNT UNIT COST TOTAL COMMENTS<br />
Bus Shelter LS 1 $25,000.00 $25,000.00 per John Willis<br />
TOTAL UNIT COST $25,000.00<br />
Traffic Calming (Unit: Percentage)<br />
ITEM UNIT AMOUNT UNIT COST TOTAL COMMENTS<br />
The cost <strong>of</strong> this item is dependent on other<br />
$0.00<br />
contruction costs; typically 5-10% <strong>of</strong> const. cost<br />
TOTAL UNIT COST $0.00<br />
Illumination (Unit: Mile)<br />
ITEM UNIT AMOUNT UNIT COST TOTAL COMMENTS<br />
Luminaire and appurtenances EA 52 $ 5,000.00 $260,000.00<br />
TOTAL UNIT COST $260,000.00<br />
Luminaire, pole, wiring, etc (1 pole on each side<br />
every 200'=52 poles)<br />
Landscaping (Unit: Mile)<br />
ITEM UNIT AMOUNT UNIT COST TOTAL COMMENTS<br />
Landscaping LS 1 $ 235,000.00 $235,000.00<br />
TOTAL UNIT COST $235,000.00<br />
Plantings, Trees, Topsoil, and Irrigation sums up to<br />
aproximately $235,000 per mile (for both sides <strong>of</strong><br />
roadway)<br />
Bridges (Unit: Square Foot)<br />
ITEM UNIT AMOUNT UNIT COST TOTAL COMMENTS<br />
The cost <strong>of</strong> this item is project dependent; see note 3<br />
$0.00<br />
<strong>of</strong> the directions tab for more information<br />
TOTAL UNIT COST $0.00<br />
Walls (Unit: Square Foot)<br />
ITEM UNIT AMOUNT UNIT COST TOTAL COMMENTS<br />
Standard Retaining Wall LS 1 $50.00 $50.00 Wall cost is approx. $50/SF<br />
TOTAL UNIT COST $50.00<br />
Right-<strong>of</strong>-Way (Unit: Square Foot)<br />
ITEM UNIT AMOUNT UNIT COST TOTAL COMMENTS<br />
Right-<strong>of</strong>-Way Acquisition LS 1 $8.00 $8.00 ROW acquisition cost is approx. $8/SF<br />
TOTAL UNIT COST $8.00