Day 3<br />

RM 10.2: Various strategies for flash flood risk acceptance<br />

Acceptable risk, as defined in the United Nations International Strategy for Disaster Reduction, is the level <strong>of</strong><br />

loss that a society or community considers acceptable within the given existing social, economic, political,<br />

cultural, technical, and environmental conditions (UNISDR 2009). There are three main types <strong>of</strong> risk<br />

acceptance strategies: toleration, emergency response systems, and insurance.<br />

Toleration<br />

Toleration <strong>of</strong> risk implies that a competent authority (local, regional, or national) accepts that flash floods can<br />

occur. In this case, it is very likely that the competent authority will accept the results <strong>of</strong> the risk assessment and<br />

not promote any activities to reduce the risk.<br />

Emergency response systems<br />

All emergency plans (regional, district, local) should be based on a national emergency plan so that<br />

emergency operations within a particular country will be carried out according to the same doctrine <strong>of</strong> civil<br />

protection and in a concerted manner. In general, the various public authorities implicated in the emergency<br />

plan will play roles related to their day-to-day responsibilities. They must prepare themselves according to the<br />

mission statement established in the emergency plan. To this end, each competent authority (regional, district,<br />

local) should have its own emergency plan, accompanied by an operations manual.<br />

Insurance<br />

Insurance against flash flood damage should be an integral part <strong>of</strong> risk acceptance. However, many countries<br />

in the HKH region still do not have this practice because <strong>of</strong> the high costs involved. Insurance companies<br />

have various policies that cover risk. Insurance policies that apply only at the local level are far too expensive<br />

both for the insurance companies and for the private and public subscribers.<br />

RM 10.3: Various strategies for flash flood risk reduction<br />

<strong>Risk</strong> reduction is one <strong>of</strong> the main goals in flash flood management. It can be dealt with in two ways: through<br />

prevention strategies and through mitigation strategies.<br />

Prevention strategies<br />

Watershed management. (See also Session 12.) Watershed management has both structural and nonstructural<br />

components. Watershed management is cross-cutting and closely related both to the socio-economic<br />

status <strong>of</strong> the community and its development. Watershed management takes into consideration a number<br />

<strong>of</strong> basic principles related to run<strong>of</strong>f and erosion including soil, topography, land cover and use, farming<br />

practices, and floodplain zoning. This topic is covered in more detail later in the section on watershed<br />

management and the integrated flash flood management approach.<br />

session 10<br />

Financial measures. Financial support can be provided after a flash flood occurs in order to aid communities<br />

in dealing with the aftermath <strong>of</strong> the disaster. Usually this aid is administered through national or regional<br />

agencies. Financial measures can be<br />

• an economic contribution or the waiver <strong>of</strong> a financial burden such as: taxes, loan interest, or the<br />

liquidation <strong>of</strong> a loan;<br />

• financial support to individuals and local communities for planning, constructing, and maintaining structural<br />

interventions that can be shared among national, provincial, and local administrative levels, with the total<br />

amount divided among them (the share <strong>of</strong> the burden generally increasing progressively from local to<br />

provincial to national level);<br />

• support to maintain and regulate hydraulic works <strong>of</strong> public interest (where the support is given to those<br />

who maintain it);<br />

67