REVISED PROJECT DESCRIPTION AND ENVIRONMENTAL IMPACT ASSESSMENT (<strong>EIA</strong>) REGISTRATION<br />

FOR THE NEPISIGUIT FALLS GENERATING STATION MODIFICATION AND REHABILITATION PROJECT<br />

included in this section as <strong>the</strong>y will take place during or after <strong>the</strong> Construction phase of <strong>the</strong><br />

Project, prior to removal of <strong>the</strong> Coffer Dam.<br />

Appendix C provides <strong>the</strong> preliminary design drawings <strong>for</strong> <strong>the</strong> work, including:<br />

1. plan view of <strong>the</strong> Coffer Dam;<br />

2. cross section of <strong>the</strong> Coffer Dam;<br />

3. plan view of <strong>the</strong> access road and work plat<strong>for</strong>m;<br />

4. plan view of <strong>the</strong> spillway concrete repairs;<br />

5. cross section of <strong>the</strong> spillway concrete repairs;<br />

6. plan view of <strong>the</strong> rubber dam;<br />

7. cross section of <strong>the</strong> rubber dam;<br />

8. schematic of <strong>the</strong> Nepisiguit Falls Generating Station; and<br />

9. schematic of <strong>the</strong> replacement coarse trash rack system and intake deck.<br />

2.2.1 Installation of <strong>the</strong> Coffer Dam<br />

A Coffer Dam will be constructed in <strong>the</strong> wet (without dewatering of <strong>the</strong> <strong>for</strong>ebay and headpond)<br />

downstream of <strong>the</strong> two-span bridge. The Coffer Dam will consist of a rock berm, with an<br />

impermeable geomembrane on <strong>the</strong> upstream face as shown in Drawings 1 and 2 (Appendix C).<br />

The Coffer Dam will also provide road access <strong>for</strong> machinery required <strong>for</strong> Construction.<br />

Construction and removal of <strong>the</strong> Coffer Dam will proceed as follows:<br />

• draw down of <strong>the</strong> headpond to approximately 102.1 m (335 ft) (approximately 2 m or 7 ft<br />

below normal operating levels) through <strong>the</strong> turbines, submerged gate or with <strong>the</strong> rubber<br />

dam;<br />

• installation of turbidity curtains upstream and downstream of <strong>the</strong> Coffer Dam location;<br />

• cleaning of <strong>the</strong> bottom of <strong>the</strong> <strong>for</strong>ebay where <strong>the</strong> Coffer Dam will be placed, using a<br />

backhoe;<br />

• placement of clean, durable, non-ore bearing rockfill (0 cm to 91.4 cm (0” to 36”) in size)<br />

into <strong>the</strong> <strong>for</strong>ebay by machinery from <strong>the</strong> north bank;<br />

• placement of a geomembrane and protective geotextile (<strong>the</strong> geomembrane will be<br />

placed between two surfaces of geotextile) on <strong>the</strong> upstream face of <strong>the</strong> Coffer Dam;<br />

Page 14 June 15, 2011