REVISED PROJECT DESCRIPTION AND ENVIRONMENTAL IMPACT ASSESSMENT (<strong>EIA</strong>) REGISTRATION<br />

FOR THE NEPISIGUIT FALLS GENERATING STATION MODIFICATION AND REHABILITATION PROJECT<br />

• implement proper storage, handling, use, and disposal procedures <strong>for</strong> any hazardous<br />

materials; and<br />

• comply with all provincial and federal legislation, permits, approvals and guidelines.<br />

Fish habitat in <strong>the</strong> LAA will be temporarily disturbed during Construction as a result of draw<br />

down of <strong>the</strong> headpond, installation of <strong>the</strong> Coffer Dam and dewatering of <strong>the</strong> PDA. The following<br />

estimates of <strong>the</strong> watered and temporary dewatered area of <strong>the</strong> <strong>for</strong>ebay are based on existing<br />

in<strong>for</strong>mation (e.g., aerial photographs, GIS in<strong>for</strong>mation). The numbers presented in Table 4.5<br />

are based on <strong>the</strong> following assumptions:<br />

• <strong>the</strong> maximum bank exposure during <strong>the</strong> construction period is 16.5 m, near <strong>the</strong> NFGS;<br />

• <strong>the</strong> zone of influence upstream of <strong>the</strong> NFGS is 4 km; and<br />

• <strong>the</strong> area of exposed bank tapers from 16.5 m at <strong>the</strong> NFGS to 0 m at <strong>the</strong> 4 km mark.<br />

Table 4.5<br />

Estimated Area (Watered and Dewatered) of <strong>the</strong> Reservoir<br />

Approximate Area (m 2 )<br />

Area of water within <strong>the</strong> 4 km zone of influence when <strong>the</strong> NFGS is in operation 548,000<br />

Area of exposed banks within <strong>the</strong> 4 km zone of influence when <strong>the</strong> headpond is<br />

dewatered<br />

65,600<br />

Area of <strong>the</strong> <strong>for</strong>ebay between <strong>the</strong> Coffer Dam and <strong>the</strong> power house 5,000<br />

Area of total potential temporary HADD (exposed bank and dewatered <strong>for</strong>ebay) 70,600<br />

While approximately 70,600 m 2 of headpond (exposed banks and dewatered work area<br />

representing about 13% of <strong>the</strong> total area of <strong>the</strong> headpond) will be temporarily dewatered as a<br />

result of <strong>the</strong> draw down required <strong>for</strong> <strong>the</strong> Project, with planned mitigation to avoid direct mortality<br />

of fish and disturbance of fish and fish habitat, <strong>the</strong> likelihood of adverse environmental effects to<br />

fish habitat quality or quantity is expected to be low.<br />

Installation of <strong>the</strong> Coffer Dam, in addition to allowing certain aspects of <strong>the</strong> Project to be<br />

completed “in <strong>the</strong> dry”, will also provide mitigation <strong>for</strong> erosion and sedimentation which could<br />

result from <strong>the</strong> Project. The Coffer Dam will allow <strong>the</strong> water channel upstream of <strong>the</strong> NFGS to<br />

be maintained at close to normal low flow conditions. This will reduce <strong>the</strong> potential <strong>for</strong><br />

re-suspension and erosion of sediments previously deposited. By maintaining <strong>the</strong> water level in<br />

<strong>the</strong> headpond, <strong>the</strong> probability of erosion along <strong>the</strong> floor and banks of <strong>the</strong> headpond that could<br />

result in suspension of sediment to <strong>the</strong> water column is minimized. Installation of <strong>the</strong> Coffer<br />

Dam will also reduce <strong>the</strong> level of draw down of <strong>the</strong> headpond required <strong>for</strong> <strong>the</strong> Project, and<br />

<strong>the</strong>re<strong>for</strong>e minimize <strong>the</strong> amount of exposed bank that could potentially be eroded during heavy<br />

precipitation. Fish rescue within <strong>the</strong> dewatered area will prevent undue mortality of fish.<br />

Erosion and sedimentation may increase <strong>the</strong> amount of suspended solids in <strong>the</strong> water column<br />

and may increase <strong>the</strong> amount of fine material that settles over <strong>the</strong> substrate. Such materials<br />

can smo<strong>the</strong>r fish eggs that occur on <strong>the</strong> river bottom, or can smo<strong>the</strong>r benthic invertebrates that<br />