Environmental Impact Assessment(EIA) Registration for the ...
Environmental Impact Assessment(EIA) Registration for the ...
Environmental Impact Assessment(EIA) Registration for the ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
REVISED PROJECT DESCRIPTION AND ENVIRONMENTAL IMPACT ASSESSMENT (<strong>EIA</strong>) REGISTRATION<br />
FOR THE NEPISIGUIT FALLS GENERATING STATION MODIFICATION AND REHABILITATION PROJECT<br />
Thus, in consideration of <strong>the</strong> nature of <strong>the</strong> interactions and <strong>the</strong> planned implementation of<br />
known and proven mitigation, <strong>the</strong> potential environmental effects of <strong>the</strong> Project activities and<br />
physical works ranked as 0 or 1 in Table 4.3 on <strong>the</strong> Aquatic Environment are rated not<br />
significant, and are not considered fur<strong>the</strong>r in <strong>the</strong> assessment.<br />
4.3.4 <strong>Assessment</strong> of Project-Related <strong>Environmental</strong> Effects<br />
The following interactions were ranked as 2 in Table 4.3 and are considered fur<strong>the</strong>r in <strong>the</strong><br />
assessment of Project-related environmental effects:<br />
• installation of <strong>the</strong> Coffer Dam;<br />
• installation of <strong>the</strong> Working Plat<strong>for</strong>m; and<br />
• removal of <strong>the</strong> Coffer Dam and Working Plat<strong>for</strong>m.<br />
A summary of <strong>the</strong> environmental effects assessment and prediction of residual environmental<br />
effects resulting from interactions ranked as 2 on <strong>the</strong> Aquatic Environment is provided in<br />
Table 4.4.<br />
Page 52 June 15, 2011