REVISED PROJECT DESCRIPTION AND ENVIRONMENTAL IMPACT ASSESSMENT (<strong>EIA</strong>) REGISTRATION FOR THE<br />

NEPISIGUIT FALLS GENERATING STATION MODIFICATION AND REHABILITATION PROJECT<br />

Appendix A: New Brunswick <strong>EIA</strong> – Additional In<strong>for</strong>mation Requirements<br />

Final Report<br />

v) Siting Considerations The Project will be constructed within <strong>the</strong> footprint of <strong>the</strong> existing<br />

<strong>for</strong>ebay, dam and hydroelectric generating station at Nepisiguit<br />

Falls. The property has been used <strong>for</strong> <strong>the</strong> purpose of generating<br />

electricity since 1921. No alternative sites were considered as<br />

<strong>the</strong>y would not meet <strong>the</strong> Project purpose.<br />

The Project is located within 30 metres of a watercourse by nature<br />

of <strong>the</strong> Project (i.e., a dam and hydroelectric generating station).<br />

No wetlands, including riparian wetlands, were identified within <strong>the</strong><br />

Project development area, nor would any wetlands be affected by<br />

Project activities.<br />

The Project is not located within a designated wellfield or<br />

watershed. No Project activities are anticipated to influence<br />

potable wells during any phase of <strong>the</strong> Project.<br />

The Project is not located within Coastal Zone A or B (not<br />

applicable as <strong>the</strong> Project is not located near <strong>the</strong> coast of <strong>the</strong><br />

marine environment).<br />

vi)<br />

Physical Components and<br />

Dimensions of <strong>the</strong> Project<br />

A description of <strong>the</strong> Project components is provided in Section 2.1<br />

of <strong>the</strong> <strong>EIA</strong> <strong>Registration</strong> document. Project design details are<br />

provided in Appendix C.<br />

Please refer to Figure 2.1 Project Overview and Appendix C <strong>for</strong><br />

engineering design drawings showing: Cross Section of Forebay<br />

Spillway Dam Work Area; Rubber Dam Plan View and Front<br />

Elevation; Rubber Dam Cross Section; Spillway Concrete Repair<br />

Works Plan and Details; and Access and Work Plat<strong>for</strong>m Plan.<br />

vii) Construction Details An overview of <strong>the</strong> construction activities <strong>for</strong> <strong>the</strong> Project is<br />

provided in Section 2.2 of <strong>the</strong> <strong>EIA</strong> <strong>Registration</strong> document.<br />

Construction will begin in June, 2012 with completion by<br />

September 30, 2012.<br />

Site access would be provided via <strong>the</strong> current onsite access roads<br />

owned by NB Power. Access to <strong>the</strong> Nepisiguit Falls Generating<br />

Station would take place on approved routes including Nepisiguit<br />

Falls Road which connects to Highway Route 430 to Bathurst.<br />

viii) Operation and Maintenance<br />

Details<br />

An overview of <strong>the</strong> operation of <strong>the</strong> Project is provided in<br />

Section 2.3 of <strong>the</strong> <strong>EIA</strong> <strong>Registration</strong> document.<br />

The estimated life span based on current design standards of <strong>the</strong><br />

Project is 50-75 years.<br />

ix)<br />

Future Modifications,<br />

Extensions, or<br />

Abandonment<br />

Not applicable at this time.<br />

x) Project-Related Documents No o<strong>the</strong>r documents are publically available.<br />

June 15, 2011 A-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!