REVISED PROJECT DESCRIPTION AND ENVIRONMENTAL IMPACT ASSESSMENT (<strong>EIA</strong>) REGISTRATION FOR THE<br />
NEPISIGUIT FALLS GENERATING STATION MODIFICATION AND REHABILITATION PROJECT<br />
Appendix A: New Brunswick <strong>EIA</strong> – Additional In<strong>for</strong>mation Requirements<br />
Final Report<br />
v) Siting Considerations The Project will be constructed within <strong>the</strong> footprint of <strong>the</strong> existing<br />
<strong>for</strong>ebay, dam and hydroelectric generating station at Nepisiguit<br />
Falls. The property has been used <strong>for</strong> <strong>the</strong> purpose of generating<br />
electricity since 1921. No alternative sites were considered as<br />
<strong>the</strong>y would not meet <strong>the</strong> Project purpose.<br />
The Project is located within 30 metres of a watercourse by nature<br />
of <strong>the</strong> Project (i.e., a dam and hydroelectric generating station).<br />
No wetlands, including riparian wetlands, were identified within <strong>the</strong><br />
Project development area, nor would any wetlands be affected by<br />
Project activities.<br />
The Project is not located within a designated wellfield or<br />
watershed. No Project activities are anticipated to influence<br />
potable wells during any phase of <strong>the</strong> Project.<br />
The Project is not located within Coastal Zone A or B (not<br />
applicable as <strong>the</strong> Project is not located near <strong>the</strong> coast of <strong>the</strong><br />
marine environment).<br />
vi)<br />
Physical Components and<br />
Dimensions of <strong>the</strong> Project<br />
A description of <strong>the</strong> Project components is provided in Section 2.1<br />
of <strong>the</strong> <strong>EIA</strong> <strong>Registration</strong> document. Project design details are<br />
provided in Appendix C.<br />
Please refer to Figure 2.1 Project Overview and Appendix C <strong>for</strong><br />
engineering design drawings showing: Cross Section of Forebay<br />
Spillway Dam Work Area; Rubber Dam Plan View and Front<br />
Elevation; Rubber Dam Cross Section; Spillway Concrete Repair<br />
Works Plan and Details; and Access and Work Plat<strong>for</strong>m Plan.<br />
vii) Construction Details An overview of <strong>the</strong> construction activities <strong>for</strong> <strong>the</strong> Project is<br />
provided in Section 2.2 of <strong>the</strong> <strong>EIA</strong> <strong>Registration</strong> document.<br />
Construction will begin in June, 2012 with completion by<br />
September 30, 2012.<br />
Site access would be provided via <strong>the</strong> current onsite access roads<br />
owned by NB Power. Access to <strong>the</strong> Nepisiguit Falls Generating<br />
Station would take place on approved routes including Nepisiguit<br />
Falls Road which connects to Highway Route 430 to Bathurst.<br />
viii) Operation and Maintenance<br />
Details<br />
An overview of <strong>the</strong> operation of <strong>the</strong> Project is provided in<br />
Section 2.3 of <strong>the</strong> <strong>EIA</strong> <strong>Registration</strong> document.<br />
The estimated life span based on current design standards of <strong>the</strong><br />
Project is 50-75 years.<br />
ix)<br />
Future Modifications,<br />
Extensions, or<br />
Abandonment<br />
Not applicable at this time.<br />
x) Project-Related Documents No o<strong>the</strong>r documents are publically available.<br />