Menzi Muck A61<br />

2.17 Shut-off operation<br />

When not in use operator must lower boom and chassis. Furthermore, in winter, the hydraulic hoses on<br />

the chassis and the piston rods must be cleaned so that dirt does not freeze on to them.<br />

– Set back speed adjusting lever so that the engine is made to idle. Do not switch off engine from full<br />

load but let it idle for three minutes to equalize the temperature. Shutting down from full load can<br />

lead to turbo damage.<br />

– Turn ignition key to position 0, engine shuts off. The engine can also be shut off with the Emergency<br />

switch but must be unlocked before starting by turning, otherwise the engine can not be started.<br />

Caution: During work breaks or when work ends, remove ignition key and make it inaccessible<br />

to unauthorized persons.<br />

2.18 Excavator operation<br />

– As soon as the diesel engine has reached its operating temperature and is running at a speed<br />

between 50 and 75% of the max. speed, start the operating or driving movements so that not only<br />

the hydraulic tank but the whole hydraulic system is uniformly heated. In this way the machine will<br />

quickly reach its full working performance. For excavating operation the diesel engine should run at<br />

least 65% of the max. speed. According to the operating activity, the speed must be changed via the<br />

speed adjusting lever.<br />

– Slowing down the upper structure by reversing, i.e. switching on the opposite direction of rotation, is<br />

not permissible.<br />

– Never knock off slopes with the boom or dipper or fill in ditches from the side.<br />

– Grade in boom direction only.<br />

– In winter, the machine must be shut down on dry subsoil to prevent it freezing up.<br />

– The excavator is designed for operating in terrain up to 100% in the line of dip and 70% diagonally to<br />

the line of dip without terrain preparation.<br />

– Only persons which are trained adequately and are authorized may operate the machine.<br />

– The contractor is responsible for adapting safety instructions to local laws and condiditions, where<br />

necessary.<br />

– Before starting excavator operation the operator checks effectiveness of operating and safety<br />

elements. During operation he monitors the correct function of the machine.<br />

– Observed defects must be reported to the foreman or to the succeeding operator.<br />

– In the event of trouble which endanger safety of machine operation must be stopped immediately.<br />