09.11.2012 Views

Maintenance and Care

Maintenance and Care

Maintenance and Care

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Working with the machine<br />

Hoisting operation<br />

Switch on the overload warning device with the switch on the right is you<br />

want to move a load within the load range<br />

An acoustic <strong>and</strong> visual signal (19 warns you if the load is too heavy to be<br />

liftedIf a warning is issued then the load must be lowered to the bottom immediately<br />

(danger of tilting).<br />

Note !<br />

Liability<br />

The manufacturer refuses to accept any liability for damage resulting<br />

form nonobservance of<br />

operating instructions or if the customer carries out changes to<br />

the overload warning device. 1<br />

Load diagram T1.8<br />

Requirements: Even <strong>and</strong> paved location, stabilizers <strong>and</strong> wheels to max. width,<br />

stabilizers extendend, chassis as low as possible.<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

1<br />

0<br />

-1<br />

-2<br />

-3<br />

-3 -2 -1 0 1 2 3 4 5 6 7 8<br />

Operation Manual Menzi Muck A81 Page 103<br />

kN<br />

100<br />

90<br />

80<br />

70<br />

60<br />

50<br />

40<br />

30<br />

20<br />

10<br />

0<br />

-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!