09.11.2012 Views

Maintenance and Care

Maintenance and Care

Maintenance and Care

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Transport, packaging <strong>and</strong> storage<br />

7. Swivel the upper structure by 180°<br />

(pull up boom <strong>and</strong> dipper when<br />

swivelling).<br />

8. Position the excavator arm between<br />

the front support <strong>and</strong> then<br />

place on the ground<br />

9. Lower the boom <strong>and</strong> at the same<br />

time slightly extend the dipper<br />

so that the complete excavator is<br />

lifted to the height of the loading<br />

bridge.<br />

10. Extend the excavator arm including<br />

the telescope <strong>and</strong> at the<br />

same time activate the travelling<br />

gear until the machine is completely<br />

on the loading bridge.<br />

11. Before the excavator arm is lifted,<br />

make sure that the steering wheels<br />

are fully on the loading bridge.<br />

12. Move the machine to the required<br />

position using the hub engine.<br />

13. Lower the excavator arm onto the<br />

loading area.<br />

14. Switch off the motor.<br />

15. Release the residual pressure<br />

from the hydraulic system.<br />

The procedure for unloading is the reverse of that of loading.<br />

Operation Manual Menzi Muck A81 Page 33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!