The catalytic reforming unit was overhauled in <strong>2005</strong> to allow isomerization. The work was completed<br />

in the first quarter of 2006, allowing production of motor gasolines to Euro-3 standards.<br />

These gasolines have improved density and better fractional and hydrocarbon content in order to<br />

meet the needs of modern vehicle engines. They satisfy the latest international environmental<br />

standards for fuels.<br />

LUKOIL began complex reconstruction and modernization of the Nizhny Novgorod Refinery in <strong>2005</strong><br />

and the process is due for completion in 2009. Total capital expenditures on this project are estimated<br />

at $600 million, most of which will be spent on construction of catalytic cracking, alkylation and visbreaking<br />

units.<br />

Planning and research work was carried out in <strong>2005</strong> for construction of a deep refining complex at<br />

Nizhny Novgorod, based on the unit for catalytic cracking of vacuum gasoil. The complex is due to be<br />

commissioned in 2009.<br />

REFINING, PETROCHEMICALS AND MARKETING<br />

The Ukhta Refinery commissioned a Recovery Plus module to increase hydrogen concentration in<br />

the hydrodeparaffinization unit. The unit can now produce up to 250,000 tonnes of Arctic diesel fuel<br />

per year. The Recovery Plus module can also extract up to 13,000 tonnes per year of high-octane light<br />

reformate (С 4 -С 5 fractions) from hydrogen-rich gas. This reformate is a valuable component for blending<br />

of gasolines.<br />

Work continued in <strong>2005</strong> on the second stage of a rail loading-rack complex for unloading of crude oil<br />

and loading of dark petroleum products. The work is due for completion in the third quarter of 2006<br />

and the rack will have 4 million tonnes annual capacity.<br />

The Ukhta Refinery also began technical refitting of its catalytic reforming unit in <strong>2005</strong>. The work will<br />

be completed in the third quarter of 2006 and will reduce gasoline production costs.<br />