Tender No DRM/S&T(ADI)/ Tele/ 02 of 2012-13<br />

Chapter – II – Special Condition of Contract<br />

2.0 SPECIAL CONDITIONS <strong>OF</strong> CONTRACT<br />

The Tender shall be governed by the following Special Conditions of Contract<br />

(SCC), and Technical specifications etc (Chapters III and IV) in addition to the<br />

General Conditions of Contract of Western Railway (hereinafter called as GCC,<br />

although meant for civil engineering works but will also be applicable to this<br />

work). Where there is any conflict between the instructions to Tenderer,<br />

conditions of tendering, special condition of contract, Tender forms, Annexure<br />

etc. on one hand and GCC on the other, the former (SCC) shall prevail. Similarly<br />

in case of any conflict between the SCC and the Technical Specifications of the<br />

Contract, the latter shall prevail.<br />

Any Special conditions stated by the Tenderer in the covering letter<br />

submitted along with the tender shall be deemed to be part of the Contract to<br />

such extent only as have been explicitly accepted by the Railway.<br />

Performed and the method of construction, these specifications / documents<br />

describe the material to be supplied, work to be for the complete installation in<br />

strict accordance with the drawings and specifications mentioned here and such<br />

instructions as may from time to time be given by the Railway.<br />

It should clearly be understood that the contractor agrees to furnish, without any<br />

extra cost, anything and everything necessary for the complete installation and its<br />

reliable, safe and satisfactory working except such items as are specifically stated<br />

as being supplied by the Railway in this specification and at the time of placing<br />

the contract by the written agreement, the contractor shall quote for the work,<br />

given all information.<br />

2.1 Completion period:<br />

The entire work shall be completed with in a period of 2 calendar months from<br />

the date of issue of LOA of the tender.<br />

2.2 SCOPE <strong>OF</strong> WORK :<br />

The scope of work against which tenders are invited, involves the following two<br />

distinct parts:-<br />

2.2.1 (a) The CCTV camera system shall be monitor to patients in ICU covered in this<br />

tender document is to be installed and commissioned at Sabarmati Hospital<br />

ICU. The system to be provided shall be consist of PTZ dome camera, recording<br />

in 4 channel DVR and associated data, power cable etc., It shall be an integrated<br />

the video management software can work and integrate with as per schedule<br />

standard cameras and IT Hardware.<br />

Divisional Railway Manager (S & T) Ahmedabad-45<br />

For & on behalf of the president of India<br />

Chapter- II Page 1 of 32