Tender No DRM/S&T(ADI)/ Tele/ 02 of 2012-13<br />

Chapter – II – Special Condition of Contract<br />

2.17 INSPECTION <strong>OF</strong> WORKS:<br />

The Engineer In-charge or his authorized representative may inspect and test the<br />

various portions of the work at all stages and shall have full power to reject all or<br />

any portion of the work that he may consider to be defective or inferior in quality<br />

of materials, workmanship or design in comparison to what is called for in the<br />

specification. In the event of rejection of any work already executed and not in<br />

accordance with specification as in this tender and / or as determined by the<br />

Engineer or which the Contractor has been apprised, the Contractor shall carry<br />

out alterations/replacements to such works to the satisfaction of the Engineer Incharge<br />

of the work for which no additional payment will be borne by the<br />

Railways.<br />

2.18 INSPECTING <strong>OF</strong>FICER – POWER <strong>OF</strong> REJECTION<br />

The supply portion of work wilI be inspected by ADSTE/ADI or any<br />

representative of DRM(S&T) ADI as nominated to realize the end objective. The<br />

execution portion will be inspected by respective Sectional officer or any<br />

representative of DRM(S&T) ADI as nominated to realize the end objective.<br />

Power of rejection:-<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

To reject any items submitted as not being in accordance with the tendered<br />

technical specification.<br />

To reject the whole of the installation offered for inspection, if after inspection the<br />

inspection authority is satisfied that the material offered for inspection is<br />

unsatisfactory.<br />

To mark the rejected stores with a rejection mark, so that they can be easily<br />

identified if resubmitted.<br />

The inspecting officer’s decision as regards the rejection shall be final and<br />

binding on the contractor.<br />

Note- The contractor shall arrange, when so required, suitable means of transport<br />

for inspection of material/ work sites by officer nominated for this purpose on<br />

the days mutually decided.<br />

2.19 CONSIGNEE’S RIGHT <strong>OF</strong> REJECTION:<br />

(i)<br />

Notwithstanding any approval which the inspecting officer may have given in<br />

respect of the stores or any materials or the work or workmanship involved in the<br />

performance of the contract (Whether with or without any test carried out by the<br />

contractor or the Inspecting officer or under the direction of the Inspecting<br />

officer) and notwithstanding delivery of the stores where so provided to the<br />

Divisional Railway Manager (S & T) Ahmedabad-45<br />

For & on behalf of the president of India<br />

Chapter- II Page 15 of 32