Tender No DRM/S&T(ADI)/ Tele/ 02 of 2012-13<br />
Chapter – II – Special Condition of Contract<br />
Cable laying shall be done as per technical specifications and instructions for<br />
trenching laying of S&T cables issued by CSTE and as per CSTE drawing no.<br />
3644 (pages 1 to 11).<br />
2. 26 SAFETY <strong>OF</strong> WORK AND TRAINS<br />
• The contractor shall conform to all Railway Rules relating to safety of<br />
personal and operation of signals and points. In the A.C. electrified areas the<br />
special precautions as laid down in the manual for installation of S&T<br />
equipment in AC electrified area, shall be taken.<br />
• The contractor shall do no work that may interfere with traffic until protection<br />
has been provided by the Railway and under the supervision of Rly's<br />
representative.<br />
• While testing and commissioning of the system, the contractor shall not work<br />
without the authorization from the railway in-charge of the work.<br />
• The contractor shall also be responsible for any damage that he may cause due<br />
to the carelessness of his workman and will bear the consequences in this<br />
regard.<br />
• The contractor will not be entitled to any compensation for any damage or<br />
loss sustained by him during execution of the work for any idle labour or<br />
transport or any loss of deterioration of the material or tools.<br />
2.27. MEANING AND INTERPRETATION BY <strong>RAILWAY</strong>S TO BE FINAL<br />
All measurement, method of measurement, meaning and intent of<br />
specifications and interpretation of Special Conditions of Contract, given and<br />
made by the Purchaser or by the Purchaser Engineer shall be final and binding<br />
and shall be considered “excepted matters” in terms of conditions laid down in<br />
the General Conditions of Contract.<br />
Divisional Railway Manager (S & T) Ahmedabad-45<br />
For & on behalf of the president of India<br />
Chapter- II Page 19 of 32